Wash. Admin. Code § 296-150T-0550

Current through Register Vol. 24-20, October 15, 2024
Section 296-150T-0550 - Do you notify the department of health after your final inspection of factory-built structures at a manufacturing location?

After we perform a final inspection of a factory-built temporary worker housing structure we will send a notice to the department of health that:

(1) Specifies what connections, standards, and incomplete items the department of health must check when the unit is installed; and/or
(2) Estimates the expected time of arrival of the factory-built temporary worker housing structure to the site.

Wash. Admin. Code § 296-150T-0550

Statutory Authority: RCW 43.22.480. 99-12-079, § 296-150T-0550, filed 5/28/99, effective 6/28/99.