* Culvert installation or replacement, and repair at or below the bankfull width in Type S and F Waters that exceed five percent gradient;
* Bridge construction or replacement, and repair at or below the bankfull width of unconfined streams in Type S and F Waters; or
* Fill within the flood level-100 year of unconfined streams in Type S and F Waters.
Wash. Admin. Code § 222-20-017