Current through Bulletin No. 2024-21, November 1, 2024
Section R649-3-18 - On-site Predrill Evaluation1. An on-site predrill evaluation of drilling operations located on state or private land shall be scheduled and conducted by the division prior to approval of an APD and no later than 30 days after receipt by the division of a complete APD. 1.1. An on-site predrill evaluation may be performed by the division prior to submittal of a complete APD at the written request of the operator.1.2. The division, the operator, and other persons associated with the surface management or construction of the well site shall attend the predrill evaluation.1.3. When appropriate, the operator's surveyor and archaeologist may also participate in the predrill evaluation.1.4. When the surface of the land involved is privately owned, the operator shall include in the APD the name, address, and telephone number of the private surface owner as shown on the property records of the county where the well is located.1.5. The surface owner shall be invited by the division to attend the predrill evaluation.1.6. The surface owner's inability to attend the predrill evaluation shall not delay the scheduled evaluation.2. Special stipulations concerning surface use or justifications for well spacing exceptions may be addressed and developed at the predrill evaluations. 2.1. Special stipulations shall be incorporated as conditions of the approved APD, together with any additional conditions determined by the division to be necessary following a review of the complete application.Utah Admin. Code R649-3-18
Amended by Utah State Bulletin Number 2020-15, effective 7/27/2020