In determining the level of any risk compensation award imposed within the range of 150% to 400% specified under Subsection 40-6-6.5(4)(d)(i)(D), the board may consider, among other factors, the geologic and engineering uncertainties and difficulties in drilling the well, the availability of information from prior and current drilling and development in the area, and the unique specified costs of the well.
Utah Admin. Code R649-2-9b