Current through Reg. 49, No. 43; October 25, 2024
Section 21.57 - Temporary Saltwater Pipeline(a) A temporary saltwater pipeline may be installed on highway right of way pursuant to a lease from the department. Before a temporary saltwater pipeline may be installed, the installation must be approved by the department.(b) The outer diameter of a pipe used for a temporary saltwater pipeline may not to exceed 12 inches.(c) A temporary saltwater pipeline may not operate at a pressure of over 60 pounds per inch.(d) A temporary saltwater pipeline may not be in place on highway right of way for a period that exceeds 180 days.43 Tex. Admin. Code § 21.57
The provisions of this §21.57 adopted to be effective April 20, 2016, 41 TexReg 2777