In addition to the requirements of § 87.112 (relating to hydrologic balance: dams, ponds, embankments and impoundments-design, construction and maintenance), each dam and embankment constructed of coal processing waste or intended to impound coal processing waste shall meet the requirements of § 90.112 (relating to hydrologic balance: dams, ponds, embankments and impoundments-design, construction and maintenance).
25 Pa. Code § 87.113