Current through Register Vol. 63, No. 12, December 1, 2024
Section 918-309-0050 - Permits for the Temporary Service or Temporary Feeder(1) Permit for each temporary construction service or temporary feeder for light and power: (a) 200 amps or less, $63;(b) 201 amps to 400 amps, $86;(c) 401 to 600 amps, $125;(d) Temporary service or temporary feeder of over 600 volts or amps use fee schedule in OAR 918-309-0040(4), (5) and (6).(2) OAR 918-309-0040(7) to (12) are applicable.(3) The fee used in this section includes the branch circuits.Or. Admin. Code § 918-309-0050
DC 74, f. 5-21-76, ef. 8-1-76; DC 102, f. & ef. 11-1-77; DC 1-1979, f. & ef. 1-5-79; DC 5-1979(Temp), f. & ef. 3-5-79; DC 10-1979, f. & ef. 6-8-79; DC 12-1981, f. 9-29-81, ef. 10-1-81; DC 10-1982, f. & ef. 3-1-82; DC 7-1983, f. & ef. 3-11-83; Renumbered from 814-022-0108; BCA 10-1991, f. 4-26-91, cert. ef. 7-1-91; BCD 19-1996, f. 9-17-96, cert. ef. 10-1-96; Renumbered from 918-260-0240; BCD 9-1998(Temp), f. 6-2-98, cert. ef. 7-1-98 thru 12-27-98; BCD 18-1998, f. 9-30-98, cert. ef. 10-1-98; BCD 23-2000, f. 9-29-00, cert. ef. 10-1-00; BCD 9-2001(Temp), f. 8-15-01, cert. ef. 9-4-01 thru 3-3-02; BCD 10-2001, f. 9-28-01, cert. ef. 10-1-01Stat. Auth.: ORS 455.020 & ORS 479.870
Stats. Implemented: ORS 455.020 & ORS 479.870