Current through Register Vol. 35, No. 21, November 5, 2024
Section 14.5.2.11 - ISSUANCEA.Plan review. If the submittal documents do not comply with construction codes 14.5.7 through 14.5.10 NMAC, the AHJ shall reject them and shall communicate the reasons for rejection to the applicant in writing. If the submittal documents meet the applicable codes and rules, the submittal documents shall be approved and the AHJ shall issue a permit to the applicant after payment in full of the applicable permit fees, as set forth in 14.5.5 NMAC or as required by the AHJ.B.Authorization to change. No change or modification may be made to the approved submittal documents for which a permit has been issued without the express, written authorization of the AHJ. All work authorized by a permit must be performed in accordance with the approved submittal documents for which the permit was issued. Changes in the work, occupancy type, occupant load or kind of structure authorized by a permit must be reflected in an amended set of submittal documents, which must be resubmitted for approval by the AHJ.N.M. Admin. Code § 14.5.2.11
14.5.2.11 NMAC - Rp, 14.7.2.10 NMAC, 14 NMAC 9.2.I.100 & 14 NMAC 9.2.II.100, 7-1-04; A, 1-28-11, Adopted by New Mexico Register, Volume XXVII, Issue 21, November 15, 2016, eff. 11/15/2016, Adopted by New Mexico Register, Volume XXXIII, Issue 03, February 8, 2022, eff. 3/10/2022