(c) The application fee for a commercial, institutional, industrial, or other non-residential development application submitted pursuant to N.J.A.C. 7:50-4.14, 4.33, 4.52, or 4.66 shall be calculated in accordance with the following, based on typical construction costs, except as provided at (c)1 through 10 below: Construction Cost | Required Application Fee |
$0 - $500,000 | 1.25 percent of construction costs |
$500,001-$1,000,000 | $6,250 + one percent of construction costs above $500,000 |
Greater than $1,000,000 | $11,250 + 0.75 percent of construction costs above $1,000,000 |
Typical construction costs shall include all costs associated with the development for which the application is being submitted, including, but not limited to, site improvement and building improvement costs, but shall not include interior furnishings, atypical features, decorative materials or other similar features. Supporting documentation of the expected construction costs shall be submitted as part of the application for development, unless the maximum fee pursuant to (e)3 below is required, in which case no such documentation shall be necessary.
1. For an off-road vehicle event conducted in accordance with N.J.A.C. 7:50-6.143(a)4, the fee shall be $ 6.25 per mile, or portion thereof, of the route proposed;2. For a forestry application or renewal application, submitted pursuant to N.J.A.C. 7:50-6.43(b) or (c), for forestry activities involving 10 or more acres, the fee shall be $ 6.25 per acre, or portion thereof, that is subject to the forestry activities;3. For the development of a golf course, the fee shall be $ 187.50 per acre, or portion thereof, devoted to the golf course facility, including, but not limited to, the golf course and associated forested areas, club house, putting greens, driving range, parking areas, locker rooms, and accessory buildings, such as rest rooms, maintenance buildings, and other recreational areas depicted on the site plan submitted as part of the application. All areas associated with the planning, construction, operation, or maintenance of a golf course facility, including those areas not directly associated with golfing or a recreational activity, must be included in the acreage used to calculate the applicable application fee for the development of a golf course;4. For a proposed linear development, the application fee shall be $ 187.50 per acre, or portion thereof, of all land included in the right of way of the proposed linear development project and all land located outside of the right of way that will be disturbed as part of a linear development project. "Linear development" means land uses such as roads, railroads, sewerage, and stormwater management pipes, gas and water pipelines, electric, telephone, and other transmission or distribution lines, which have the basic function of connecting two points, the rights-of-way therefor, and any accessory structures or uses directly associated therewith. For purposes of this section, linear development shall not include residential, commercial, office or industrial buildings, improvements within a development such as utility lines or pipes, bridges, or internal circulation roads;5. For a resource extraction permit application or permit renewal application, the application fee shall be $ 1,875 plus $ 37.50 per acre to be mined, or portion thereof, within each permit period;6. For a change of use with no additional development or a home occupation, the application fee shall be $ 250.00;7. For an application for a subdivision or resubdivision only, with no other development, the application fee shall be calculated according to the formula in (b)2 above, based on the total number of lots that will exist following the subdivision or resubdivision regardless of the number of lots that existed prior to the subdivision;8. For the demolition of a structure 50 years or older, the fee shall be $ 250.00;9. For the development of a solar energy facility, the fee shall be $ 1,500 plus $ 500.00 per acre of land to be developed, or portion thereof, including any off-site development; and10. For a well, the application fee shall be: i. $ 6,000 for any well in the Kirkwood-Cohansey aquifer that is required to meet the criteria and standards at N.J.A.C. 7:50-6.86(d); orii. Calculated based upon construction costs as set forth in this subsection for wells that are not subject to the criteria and standards at N.J.A.C. 7:50-6.86(d).