Current through Register Vol. 56, No. 21, November 4, 2024
Section 7:26E-1.10 - Control of ongoing sources and implementation of interim remedial measures(a) As a first priority, the person responsible for conducting the remediation shall: 1. Have a continuing responsibility to identify the need for any interim remedial measure necessary to remove, contain, or stabilize a source of contamination to prevent contaminant migration and to protect the public health and safety and the environment; and2. Include in each remedial phase report a description of each interim remedial measure implemented and each interim remedial measure that is planned.(b) Whenever LNAPL is measured greater than 0.01 feet in a collection point (for example, sump, monitoring well, surface water, excavation), the person responsible for conducting the remediation shall, within 60 days after LNAPL is discovered: 1. Report the presence of LNAPL to the Department on a form available on the Department's website at www.nj.gov/dep/srp/srra/forms. Information to be supplied by filling out the form includes:i. Site identification information;ii. A summary of the information describing the type of LNAPL observed and how the LNAPL was discovered;iii. The name of the responsible entity and a certification statement; andiv. The name of the licensed site remediation professional and a certification statement;2. Initiate LNAPL recovery to the extent practicable, and report the status of the actions taken within this timeframe on a form available on the Department's website at www.nj.gov/dep/srp/srra/forms. Information to be supplied by filling out the form includes:i. Site identification information;ii. A summary of the information describing the type of LNAPL observed, how the LNAPL was discovered, and initial recovery efforts;iii. The name of the responsible entity and a certification statement; andiv. The name of the licensed site remediation professional and a certification statement.(c) Within one year after LNAPL is discovered pursuant to (b) above, the person responsible for conducting the remediation shall: 1. Complete the delineation of the LNAPL;2. Initiate implementation of an LNAPL interim remedial measure to prevent LNAPL migration, reduce LNAPL contaminant mass to the extent practicable and initiate monitoring of the interim remedial measure; and3. Document the actions taken pursuant to this section and submit to the Department an LNAPL interim remedial measure report with a form available on the Department's website at ). N.J. Admin. Code § 7:26E-1.10