N.H. Admin. Code § He-P 4044.07

Current through Register No. 44, October 31, 2024
Section He-P 4044.07 - Shielding and Safety Design Requirements
(a) A qualified expert, registered with DHHS/RHS, pursuant to He-P 4040.06, shall be consulted in the design of a particle accelerator installation and called upon to perform a radiation survey when the accelerator is first capable of producing radiation.
(b) Each particle accelerator installation shall be provided with such primary and secondary barriers as are as necessary to assure compliance with He-P 4020.05 and He-P 4020.13.

N.H. Admin. Code § He-P 4044.07

#6827, eff 8-6-98; ss by #8692, INTERIM, eff 7-27-06, EXPIRES: 2-2-07; ss by #8808, eff 1-24-07

Amended byVolume XXXV Number 14, Filed April 9, 2015, Proposed by #10804, Effective 3/26/2015, Expires3/26/2025.