Nev. Admin. Code § 522.730

Current through June 11, 2024
Section 522.730 - Request to conduct hydraulic fracturing at oil or gas well drilled and spudded before October 24, 2014
1. Notwithstanding any provision of sections 2 to 12, inclusive, of this regulation to the contrary, an operator of an oil or gas well that was drilled and spudded before October 24, 2014, may request approval from the Division to conduct a hydraulic fracturing operation at the oil or gas well by submitting a sundry notice (Form 4) to the Division. The sundry notice must include, without limitation:
(a) A cement evaluation log of the production casing string that has been conducted not less than 5 years before the submission of the sundry notice.
(b) A pressure test of the production casing string conducted in the manner prescribed by subsection 7 of NAC 522.265.
(c) Any other information required by the Division.
2. The Division will, upon receipt of a request pursuant to subsection 1, evaluate each well design which is the subject of the request and approve or disapprove the request.

Nev. Admin. Code § 522.730

Added to NAC by Comm'n on Mineral Resources by R011-14, eff. 10/24/2014

NRS 522.040, 522.119