Nev. Admin. Code § 445A.874

Current through August 29, 2024
Section 445A.874 - Preparation of documents by Director when application is complete

Once an application for a permit is complete, the Director shall prepare:

1. A draft of the permit and a tentative exemption for the aquifer, if required, or a notice of intent to deny the application.
2. A statement, or a fact sheet if the proposed injection well is determined to be a major facility, which briefly describes the derivation of the conditions in the draft of the permit and the reasons for them or, in the case of a notice of intent to deny, the reasons supporting the tentative decision.

Nev. Admin. Code § 445A.874

Added to NAC by Environmental Comm'n, eff. 7-22-87-Substituted in revision for NAC 445.42525

NRS 445A.425, 445A.465