Md. Code Regs. 26.03.01.06

Current through Register Vol. 51, No. 25, December 13, 2024
Section 26.03.01.06 - Flow Data

For each service area, flow data for all community and multi-use sewerage facilities will be presented according to either Table No. 15 for wastewater treatment plants or Table No. 15A for all principal collector sewers, interceptors, pumping stations, and associated force mains. Information presented previously in either Table No. 9 or Table No. 10 can be omitted from Table No. 15. In Table No. 15A, present data according to the flow pattern of existing sewerage system by starting with principal collector sewers and proceed to the treatment plant.

Table No. 3Projected Water Supply Demands and Planned Capacity
Service AreaPresent 1975198019902000
PopulationGPCDCapacityPopulationGPCDCapacityPopulationGPCDCapacityPopulationGPCDCapacity
totalservedunserved(gals)demandplannedtotalservedunserved(gals)demandplannedtotalservedunserved(gals)demandplannedtotalservedunserved(gals)demandplanned

------

Table No. 4Inventory of Existing Community System Wells
Well Nameor NumberAquiferCoordinateLocationDepthFeetDiameterInchesMax. SafeYieldPumpingCapacityWaterQuality
Municipal (Public)
Industrial
Private Community/Institutional

------

Table No. 5
Inventory of Existing Impounded Supplies
OwnerCrest
Elevation
(above sea level)
Spillway
Length
Total Length of DamHeight of Crest Above Stream BedFlooded Area of Crest ElevationLength of Shore Line at Crest ElevationWater Overflowed Crest for First TimeCapacity of ReservoirSafe Yield (MGD)Average Daily Withdrawal (MGD)
Municipal (Public)
Industrial
Private Community/Institutional

------

Table No. 6Inventory of Existing Water Treatment Facilities
OwnerWater SourceType TreatmentPlant Coordinate LocationRated Plant Capacity (MGD)Average Production (MGD)Max Peak Flow(MGD)StorageCapacity(MGD)Planned Expansion MGD/DatesMethod of Sludge DisposalOperating Agency
Municipal (Public)
Industrial
Private Community*/Institutional

* If transfer to public ownership is recommended, indicate expected date.

------

Table No. 8Immediate, 5 and 10 Year Priorities for Water Development
Estimated Costs*Project StatusConstr. Start
Fiscal YearandProject NumberCountyPriorityAssignedCoordinateLocationDescriptionTotalFederaland/orStateLocalImmediatePriorityProjects5 and 10 YearPeriod Projects
______Year

* Based on dollar values as of effective date of plan where applicable.

------

Table No. 9Projected Sewerage Demands and Planned Capacity
Service AreaPresent 1975198019902000
PopulationGPCDCapacityPopulationGPCDCapacityPopulationGPCDCapacityPopulationGPCDCapacity
totalservedunserved(gals)demandplannedtotalservedunserved(gals)demandplannedtotalservedunserved(gals)demandplannedtotalservedunserved(gals)demandplanned

------

Table No. 10Inventory of Existing Water Treatment Facilities
OwnerType TreatmentPlant Coordinate LocationOccupied AcresVacant AcresPoint of Discharge*Max Site CapacitySecondaryMax. Site Capacity (MGD) AdvancedExisting (MGD) CapacityFlows (MGD)Average PeakPlanned or Expected Abandonment Date of Interim MGD DateOperating Agency
Municipal(Public)
Industrial
Private Community**/Institutional

** If transfer to public ownership is recommended, indicate expected date.

------

Table No. 11Problem Areas Inventory - Individual and Community
Service AreaProblemDescriptionLocationPopulationAcresTreatment CapacityTreatment DemandPlannedCorrectionDate if Known

------

Table No. 12Water Quality Problem Due to Storm Drainage Outfalls and to Non-point Sources
Service AreaProblem DescriptionLocationReach Affected

------

Table No. 13Immediate 5 and 10 Year Priorities for Sewerage Development
Costs**Projected Schedule***
Fiscal Year and Project NumberCounty PriorityAssignedCoordinate* LocationDescription TotalPL 660 EligibilityOther Federal LocalPreliminary PlansFinancial PlansStart ConstructionComplete Construction
_____Year
_____Year

* Where applicable for both treatment facility and point of discharge location.

** Based on real dollar values.

*** Month and year-for the last 5 years the "Construction Schedule Column" and need not be filled in.

Table No. 14 Water and Sewerage Map Symbols

Click here to view Image

------

Table No. 15Flow DataWastewater Treatment Plants
Design ParametersFlowDevelopment Occupancy Units (1)
Name or Service AreaHydraulic (mgd)Organic(ppm)Avg. Day*(mgd)Max. Day & (Date**)Existing*Anticipated***BPIPWA
BODSSUCNUC
Example:117 R7 R830 R
Clear Water 3.5 200200 3.0 5.5(3-17-76)6,5007 Cnonenone

* Per Effective Date of Plan (7-1-76)

** During Previous Fiscal Year

*** List Residential (R) Separately from Commercial (C) and Industrial (I)

BPI-Building Permits Issued Per Effective Date of Plan

UC-Building Permits Issued Per Effective Date of Plan for Units under Construction

NUC-Building Permits Issued Per Effective Date of Plan for Units not under Construction

PWA-Building Permits for Unexpired Public Works Agreements Per Effective Date of Plan

(1) -Includes Industrial, Commercial and Residential Units

------

Table No. 15AFlow DataCollector Sewers, Inceptors, Pumping Stations and Force Mains
Name or Sewer Type DesignationSewerCapabilityPumping StationForce Main
Diam.(Inches)Flow,Avg.Day*mgdDesignNumber of PumpsCapacity of Each Pump(mgd)Normal PumpingCapacity (mgd)Avg. Day Pumpage* (mgd)Max. DayPumpageand Mgd (date)**Diam. (inches)Design FLow (mgd)
Example:Collector120.51.0
Clear Branch Interceptor183.55.0
Severn RunP.S. and23.63.62.53.0(3-1-76)
F.M.248.0
Clear WaterSTP(See Table No. 15)

* Per Effective Date of Plan (7-1-76)

** During Previous Fiscal Year

Md. Code Regs. 26.03.01.06

Regulations .06 amended effective § 24, 1975 (2:29 Md. R. 1735)