Current through Register Vol. 51, No. 26, December 27, 2024
Section 20.58.02.02 - Inspection Follow-Up - Specific Information RequestA. After a complaint, report, or inspection, the Engineering Division may send an operator a specific information request.B. An operator shall respond to the Engineering Division within 5 working days after receipt of a specific information request relating to an accident reportable under 49 CFR § 195.50.C. Except as provided under §B of this regulation, an operator shall respond within 30 days after receipt of a specific information request.D. The Commission may waive the requirements of §B or C of this regulation upon written request from an operator demonstrating sufficient cause.Md. Code Regs. 20.58.02.02