Section 4-13-25h - Submission of diagrams, plans, and specifications(a) The owner or operator of each bulk pesticide storage facility shall maintain diagrams, plans, and specifications of the facility on site and with the secretary. The copy maintained at the facility shall be made available to a representative of the secretary upon request.(b)(1) Each owner or operator of a bulk pesticide storage facility that is to be remodeled, an existing structure that is to be converted to use as a bulk pesticide storage facility, or a proposed bulk pesticide storage facility shall submit diagrams, plans, and specifications to the secretary before commencement of remodeling, conversion, or construction. Remodeling, conversion, or construction shall not commence until the owner or operator receives written notice from the secretary that no further information is required.(2) The owner or operator of each facility under this subsection shall complete remodeling, conversion, or construction within two years after the secretary's written notice that no additional information is required. Upon completion of the remodel, conversion, or construction, the owner or operator of a facility under this subsection shall certify on a form prescribed by the secretary that the facility meets or exceeds all the requirements of K.A.R. 4-13-25 through K.A.R. 4-13-25k and is constructed in accordance with the diagrams, plans, and specifications submitted to the secretary.(c) The diagrams, plans, and specifications shall include the facility layout, mechanical and electrical diagrams, construction materials, and the type of equipment that is located in the facility or that is to be fixed or installed in the facility. The diagrams shall be drawn to scale and shall be legible without magnification. The diagrams, plans, and specifications shall contain all information required in subsection (d).(d) The diagrams, plans, and specifications of the bulk pesticide storage facility shall be submitted with the form prescribed by the secretary. The required documentation shall include, at a minimum, the following information: (1) The location of the facility relative to the flood plain;(2) the location of the facility relative to any surface water within 1,320 feet of the facility and the distance between the facility and the surface water;(3) the distance from both the facility and the area within 100 feet of the facility to groundwater, and the location of the groundwater relative to the facility;(4) the location of any plumbing and access to private and public water supplies and the distance from the plumbing and access to the private and public water supplies;(5) the drainage pattern of the facility;(6) certification that the facility is not located on any abandoned or active oil, gas, or water well;(7) certification that the facility is not located on a utility easement;(8) the size and location of the proposed walls and flooring to be located within the facility;(9) the location and size of each bulk pesticide storage container;(10) the location and size of each loading and mixing pad;(11) the location of each appurtenance used in the storage or transfer of bulk pesticide within the facility;(12) the location of electrical equipment, wiring, and static grounding wires;(13) the location and size of dry bulk pesticide storage; and(14) any other relevant information required by the secretary.(e) Each owner or operator of a bulk pesticide storage facility shall submit the diagrams, plans, and specifications required in this regulation to the secretary at least 30 days before the date the owner or operator proposes that the construction will commence.(f) Additional time to comply with any deadline in this regulation may be granted by the secretary upon receipt of a written request and upon a showing of good cause for the additional time requested. Each request shall state the reason for the additional time requested and the amount of additional time needed.(g) The construction, remodeling, conversion, and maintenance of a facility shall conform with the diagrams, plans, and specifications submitted and required by K.A.R. 4-13-25a through K.A.R. 4-13-25k . Kan. Admin. Regs. § 4-13-25h
Authorized by and implementing K.S.A. 2-2467a; effective Dec. 27, 2002; amended Sept. 3, 2010.