Authority: IC 12-9-2-3; IC 12-11-1.1-9; IC 12-11-2.1-12
Affected: IC 12-11-1.1; IC 12-11-2.1
Sec. 2.
The support team shall collect all the information required to complete the ISP. In collecting the information needed to complete the ISP, the team shall be cognizant of the past, present, and future influences of a variety of factors that define the individual's quality of life.
460 IAC 7-4-2