329 Ind. Admin. Code 10-9-3

Current through December 12, 2024
Section 329 IAC 10-9-3 - Construction/demolition site waste criteria

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 36-9-30

Sec. 3.

(a) A construction/demolition site may accept only construction/demolition waste as defined in 329 IAC 10-2-37. The construction/demolition waste must not be further shredded, crushed, ground, pulverized, or otherwise processed after construction/demolition or prior to disposal to a form unrecognizable as construction/demolition waste. Other items are prohibited, except as specified in subsection (b).
(b) Specific, written approval by the commissioner for disposal of other items may be requested. Approvals will be granted only if the other items to be disposed of:
(1) are incidental to the construction/demolition site;
(2) are of a similar type and size to the items allowed by subsection (a); and
(3) will not create a greater threat to the environment than the items allowed by subsection (a).

329 IAC 10-9-3

Solid Waste Management Board; 329 IAC 10-9-3; filed Mar 14, 1996, 5:00 p.m.: 19 IR 1805; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; filed Apr 26, 2007, 9:41 a.m.: 20070523-IR-329050296FRA; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFA
Readopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA; readopted filed Jun 14, 2019, 2:00 p.m.: 20190710-IR-329190249BFA