170 Ind. Admin. Code 4-5-8

Current through August 28, 2024
Section 170 IAC 4-5-8 - Testing of submeters in service

Authority: IC 8-1-1-3; IC 8-1-2-36.5

Affected: IC 8-1-2-36.5

Sec. 8.

Testing of Submeters in Service. Submeters shall be tested every five years or change in tenants, whichever is greater, unless specified otherwise by the commission. Annually, the owner shall file with the commission a report showing the number of meters tested and the number of meters exceeding the standards of ANSI C12.1-1982.

170 IAC 4-5-8

Indiana Utility Regulatory Commission; 170 IAC 4-5-8; filed Dec 13, 1984, 3:13 pm: 8 IR 487, eff Jan 1, 1985 [IC 4-22-2-5 suspends the effectiveness of a rule document for thirty 30 days after filing with the Secretary of State. LSA Document #84-57(F) was filed Dec 13, 1984.]; readopted filed Jul 11, 2001, 4:30 p.m.: 24 IR 4233; readopted filed Apr 24, 2007, 8:21 a.m.: 20070509-IR-170070147RFA; readopted filed Aug 2, 2013, 2:16 p.m.: 20130828-IR-170130227RFA
Readopted filed 4/11/2019, 9:04 a.m.: 20190508-IR-170190136RFA