Current through Rules and Regulations filed through October 17, 2024
Rule 515-9-3-.09 - Response Options Open to the Operator(1) Alternatives open to the operator to respond to the violation notice are: (a) submit a written statement to the Pipeline Safety Director indicating corrective measures have achieved compliance;(b) submit a written plan of action to the Pipeline Safety Director outlining the corrective measures that will be taken to achieve compliance and when compliance is anticipated; or(c) request an informal conference with the Pipeline Safety Director and/or his staff to discuss the violation(s).(2) The alleged violation(s) may be resolved at this stage if the information submitted is in accordance with Rule 515-9-3-.09(1)(a) or Rule 515-9-3-.09(1)(b) and is accepted by the Pipeline Safety Director and/or his staff. Such acceptance shall be verified by written statement issued by the Pipeline Safety Director following a reinspection of the operator's facilities. However, if the operator selects Rule 515-9-3-09(1)(c), an informal conference will be scheduled as explained in Rule 515-9-3-.10.Ga. Comp. R. & Regs. R. 515-9-3-.09
Ga. L. 1878-79, p. 125, as amended; Ga. L. 1975, pp. 404-412.
Original Rule entitled "Response Options Open to the Operator" was filed on April 3, 1987; effective April 23, 1987.