Ga. Comp. R. & Regs. 515-12-1-.15

Current through Rules and Regulations filed through October 17, 2024
Rule 515-12-1-.15 - Inspections and Tests
(1) Each utility shall adopt a program of periodic tests, inspections and preventive maintenance aimed at achieving efficient operation of its system and the rendition of safe, adequate and continuous service.
(2) Each utility shall maintain or have access to test facilities enabling it to determine the operating and transmission capabilities of all equipment and facilities, both for routine maintenance and for trouble location. The actual transmission performance of the network shall be monitored in order to determine if the established objectives and operating requirements are met. This monitoring function consists of circuit order tests prior to placing trunks in service, routine periodic trunk maintenance tests, tests of actual switched trunk connections, periodic noise tests of sample of customer loops in each exchange, and special transmission surveys of the network.

Ga. Comp. R. & Regs. R. 515-12-1-.15

Ga. L. 1878-79, p. 125, 1907, p. 72, 1922, pp. 143, 144, 1964, p. 338, 1965, p. 283, 1973, pp. 677 to 681, 1975, Sec. 2, p. 406.

Original Rule entitled "Inspections and Tests" adopted. F. Dec. 29, 1975; eff. Jan. 1, 1976, as specified by Ga. L. 1975, p. 411.