D.C. Mun. Regs. tit. 12, app 12-K-A r. 12-K-A102

Current through Register Vol. 71, No. 39, September 27, 2024
Rule 12-K-A102 - APPLICABILITY AND CONFORMANCE

Strike Section A102.2 in Appendix A of the International Green Construction Code in its entirety and insert new Section A102.2 in Appendix A of the Green Construction Code in its place to read as follows:

A102.2

Required number and selection of project electives. New construction projects shall attain a total of 18 project electives, Level 3 alterations and core-and-shell projects shall attain 13 project electives, first time tenant fit- outs 10,000 square feet and larger shall attain ten project electives, and Level 2 alterations 50,000 square feet and larger, where 10,000 square feet of the space is being reconfigured, shall attain ten project electives. For first-time tenant fit-outs and Level 2 alterations, up to three of the project electives can come from base building features.

Selected project electives shall be applied as mandatory requirements, and shall be communicated to the code official in the manner and form specified by the code official. Electives shall be disallowed if an elective is deemed by the code official not to meet the substantial intent of the elective.

D.C. Mun. Regs. tit. 12, app 12-K-A r. 12-K-A102

Final Rulemaking published at 67 DCR 5679 (5/29/2020)