26 Del. Admin. Code § 3011-4.0

Current through Register Vol. 28, No. 4, October 1, 2024
Section 3011-4.0 - Other General Rules

These regulations shall not be construed to require any public utility to secure an Electric Transmission Supplier Certificate for any construction, modifications, upgrades, or extensions within the perimeter of any territory already served by it.

26 Del. Admin. Code § 3011-4.0

22 DE Reg. 80 (7/1/2018) (Final)