Current through Register Vol. 28, No. 5, November 1, 2024
Section 4400-10.0 - Inspection10.1 Of the maximum five (5) inspections required by Section 4422(a): 10.1.1 One inspection shall be performed once the ground is prepared for the concrete to be poured.10.1.2 One inspection shall be performed upon completion of the installation in accord with Section 4422(a).24 Del. Admin. Code § 4400-10.0