Section 13b-17-26 - Responsibility for boundary lines

Permit applicants may retain their own licensed land surveyors to determine the existing line and must inform themselves of the demarcation between the public domain and private holdings. When a portion of a developer's frontage is to be deeded to the State, and included as part of the highway right of way, the developer shall perform the necessary field survey work and prepare the deed for signature and filing. The costs incurred by the Department to bound the new or existing right of way lines and preparation of related plans and documents will be borne by the permittee.