Current through Register Vol. 47, No. 23, December 10, 2024
Section 4 CCR 723-8-8304 - Scheduled Meter Testing(a) A utility shall test, or shall arrange for testing of, service meters in accordance with the schedule in this rule or in accordance with a sampling program approved by the Commission.(b) If it wishes to use a sampling program, a utility shall file an application to request approval of a sampling program. The application shall include: (I) The information required by rules 8002(b) and 8002(c).(II) A description of the sampling program which the utility wishes to use. This description shall include, at a minimum the following:(A) The type(s) of meters subject to the sampling plan.(B) The frequency of testing.(C) The procedures to be used for the sampling.(D) The reference standard to be used for testing.(E) The accuracy of the testing and of the sampling plan.(III) An explanation of the reason(s) for the requested sampling program.(IV) An analysis which demonstrates that, with respect to assuring the accuracy of the service meters tested, the requested sampling program is at least as effective as the schedule in this rule.