310 CMR, § 9.22

Current through Register 1531, September 27, 2024
Section 9.22 - Maintenance, Repair, and Minor Project Modifications
(1)Maintenance and Repair of Fill and Structures. During the term for which the license is in effect, the licensee shall maintain and repair all authorized fill and structures in good working order for the uses authorized in the license, and in accordance with the conditions specified therein. No application for license or license amendment shall be required for such activity. Maintenance and repair include, among other things, the following activities:
(a) replacement of old pilings, decking, or rip-rap, all with material of the same dimensions and quality and in the same locations and elevations as that authorized in the license;
(b) repaving of road surfaces, installation of road curbs and lighting, replacement of railroad track, stabilization of road or rail beds, reconstruction of culverts and catch basins, and other maintenance or repair of existing public transportation facilities and associated drainage systems, as necessary to preserve or restore the serviceability of such facilities for the original use, provided that maintenance and repair shall not include the substantial enlargement of such facilities, such as roadway widening, adding shoulders, or upgrading substandard intersections;
(c) restoration to the original license specifications of licensed fill or structures that have been damaged by catastrophic events, provided that no change in use occurs and that:
1. such restoration is completed within two years of the damage-causing event;
2. in the case of flood-related damage, the cost of such restoration does not exceed 50% of the cost of total replacement according to the original license specifications;
3. the licensee provides the Department with written notice of the restoration at least ten days prior to commencement of such work; in the case of flood-related damage, said notice shall include written estimates of restoration and replacement costs; and
4. the licensee provides the Department with written notice that the repair work has been completed in accordance with the license specifications, as certified by a Registered Professional Engineer, within 60 days of such completion; and
(d) demolition and removal of unused structures that are obsolete or otherwise no longer suitable for the uses authorized in the license, provided that written approval by the Department is obtained prior to the commencement of such work.
(2)Maintenance Dredging. Maintenance dredging may occur for five years from the date of issuance of the license or permit or for such other term, not exceeding ten years, specified therein, provided that the written notice required pursuant to the Wetlands Protection Act (M.G.L. c. 131, § 40 and 310 CMR 10.00: Wetlands Protection) has been filed with the Conservation Commission and a copy has been sent to the Department.
(3)Minor Project Modifications. The licensee may undertake minor modifications to a licensed project, or a project exempt from licensing pursuant to 310 CMR 9.05(3)(b) through (h), without filing an application for license or license amendment. Such modifications are limited to:
(a) structural alterations which are confined to the existing footprint of the fill or structures being altered and which represent an insignificant deviation from the original specifications of the license, in terms of size, configuration, materials, or other relevant design or fabrication parameters;
(b) changes of use which maintain or enhance public benefits provided by the project and which represent an insignificant deviation from the original use statement of the license, in terms of function, character, duration, patronage, or other relevant parameters; or
(c) replacement of subsurface utilities, or installation of additional utility lines in an existing right of way within previously authorized filled tidelands connecting to existing structures, provided the work will not restrict or impair access to water-dependent uses.

No such modifications shall be undertaken until the licensee has submitted written notice to the Department describing the proposed work in sufficient detail, with reference to any relevant license plans, for the Department to determine compliance with the above conditions. If the Department does not object within 30 days, the licensee may proceed with the described work without further approval by the Department.

(4) Nothing in 310 CMR 9.22(1) through (3) provisions shall be construed to exempt the work in question from obtaining other applicable approvals, including but not limited to an order of conditions under M.G.L. c. 131, § 40 and 310 CMR 10.00: Wetlands Protection.

310 CMR, § 9.22

Amended, Mass Register Issue 1261, eff. 5/23/2014.
Amended by Mass Register Issue 1512, eff. 1/5/2024.