48 C.F.R. § 225.202

Current through September 30, 2024
Section 225.202 - Exceptions
(a) (2) A nonavailability determination is not required for construction materials listed in FAR 25.104(a). For other materials, a nonavailability determination shall be approved at the levels specified in 225.103(b)(ii). Use the estimated value of the construction materials to determine the approval level. A nonavailability determination is not required before January 1, 2030, if there is an offer for foreign construction material that exceeds 55 percent domestic content (also see FAR 25.204(b)(1)(ii) and (b)(2)(ii)).

48 C.F.R. §225.202

89 FR 11954, Feb. 15, 2024
89 FR 11954, 2/15/2024