An MPT must have an inspection opening that is designed in accordance with Section VIII of the ASME BPVC (incorporated by reference; see § 64.2 ).
46 C.F.R. §64.31
An MPT must have an inspection opening that is designed in accordance with Section VIII of the ASME BPVC (incorporated by reference; see § 64.2 ).
46 C.F.R. §64.31