(b)Minimum standards and enforcement provisions for casing and cementing.(1) All casing, except the conductor casing, shall be new or reconditioned and tested casing. All casing shall meet or exceed American Petroleum Institute (API) standards for new casing. The use of reconditioned and tested used casing shall be subject to approval by the authorized officer: approval will be contingent upon the wall thickness of any such casing being verified to be at least 871/2 percent of the nominal wall thickness of new casing. Table 1 to § 3172.7(b)(1)
Violation | Corrective action | Normal abatement period |
Major | Perform remedial action as specified by the authorized officer | Prompt correction required. |
(2) For liners, a minimum of 100 feet of overlap between a string of casing and the next larger casing is required. The interval of overlap shall be sealed and tested. The liner shall be tested by a fluid entry or pressure test to determine whether a seal between the liner top and next larger string has been achieved. The test pressure shall be the maximum anticipated pressure to which the seal will be exposed. No test shall be required for liners that do not incorporate or need a seal mechanism. Table 2 to § 3172.7(b)(2)
Violation | Corrective action | Normal abatement period |
Minor | Perform remedial action as specified by the authorized officer | Upon determination of corrective action. |
(3) The surface casing shall be cemented back to surface either during the primary cement job or by remedial cementing. Table 3 to § 3172.7(b)(3)
Violation | Corrective action | Normal abatement period |
Major | Perform remedial cementing | Prompt correction required. |
(4) All of the tests described in paragraphs (b)(1) through (3) of this section shall be recorded in the drilling log. Table 4 to § 3172.7(b)(4)
Violation | Corrective action | Normal abatement period |
Minor | Perform the necessary test or provide documentation | 24 hours. |
(5) All indications of usable water shall be reported to the authorized officer prior to running the next string of casing or before plugging orders are requested, whichever occurs first. Table 5 to § 3172.7(b)(5)
Violation | Corrective action | Normal abatement period |
Major | Report information as required | Prompt correction required. |
(6) Surface casing shall have centralizers on the bottom 3 joints of the casing (a minimum of 1 centralizer per joint, starting with the shoe joint). Table 6 to § 3172.7(b)(6)
Violation | Corrective action | Normal abatement period |
Major | Logging/testing may be required to determine the quality of the job. Recementing may then be specified | Prompt correction upon determination of corrective action. |
(7) Top plugs shall be used to reduce contamination of cement by displacement fluid. A bottom plug or other acceptable technique, such as a suitable preflush fluid, inner string cement method, etc., shall be utilized to help isolate the cement from contamination by the mud fluid being displaced ahead of the cement slurry. Table 7 to § 3172.7(b)(7)
Violation | Corrective action | Normal abatement period |
Major | Logging may be required to determine the quality of the cement job. Recementing or further recementing may then be specified | Based upon determination of corrective action. |
(8) All casing strings below the conductor shall be pressure tested to 0.22 psi per foot of casing string length or 1,500 psi, whichever is greater, but not to exceed 70 percent of the minimum internal yield. If pressure declines more than 10 percent in 30 minutes, corrective action shall be taken. Table 8 to § 3172.7(b)(8)
Violation | Corrective action | Normal abatement period |
Minor | Perform the test and/or remedial action as specified by the authorized officer | 24 hours. |
(9) On all exploratory wells, and on that portion of any well approved for a 5M BOPE system or greater, a pressure integrity test of each casing shoe shall be performed. Formation at the shoe shall be tested to a minimum of the mud weight equivalent anticipated to control the formation pressure to the next casing depth or at total depth of the well. This test shall be performed before drilling more than 20 feet of new hole. Table 9 to § 3172.7(b)(9)
Violation | Corrective action | Normal abatement period |
Minor | Perform the specified test | 24 hours. |