(b)Initial statement.Before the Federal Energy Regulatory Commission
Application for License for a [Minor Water Power Project, or Major Water Power Project, 10 Megawatts or Less, as Appropriate]
(1) __________ (Name of Applicant) applies to the Federal Energy Regulatory Commission for __________ (license or new license, as appropriate) for the __________ (name of project) water power project, as described hereinafter. (Specify any previous FERC project number designation.)(2) The location of the project is:State or territory: _______________________________
County: _______________________________
Township or nearby town: _______________________________
Stream or other body of water: _______________________________
(3) The exact name, address, and telephone number of the applicant are:_______________________________
_______________________________
_______________________________
(4) The exact name, address, and telephone number of each person authorized to act as agent for the applicant in this application, if applicable, are:_______________________________
_______________________________
_______________________________
(5) The applicant is a ______ [citizen of the United States, association of citizens of the United States, domestic corporation, municipality, or State, as appropriate] and (is/is not) claiming preference under section 7(a) of the Federal Power Act. See16 U.S.C. 796 .(6)(i) The statutory or regulatory requirements of the state(s) in which the project would be located that affect the project as proposed with respect to bed and banks and the appropriation, diversion, and use of water for power purposes, and with respect to the right to engage in the business of developing, transmitting, and distributing power and in any other business necessary to accomplish the purposes of the license under the Federal Power Act, are: [provide citation and brief identification of the nature of each requirement; if the applicant is a municipality, the applicant must submit copies of applicable state or local laws or a municipal charter or, if such laws or documents are not clear, any other appropriate legal authority, evidencing that the municipality is competent under such laws to engage in the business of developing, transmitting, utilizing, or distributing power.](ii) The steps which the applicant has taken or plans to take to comply with each of the laws cited above are: [provide brief description for each requirement](7) Brief project description (i) Proposed installed generating capacity ______ MW.(ii) Check appropriate box:[] existing dam [] unconstructed dam
[] existing dam, major modified project (see § 4.30(b)(14) )
(8) Lands of the United States affected (shown on Exhibit G): (Name) | (Acres) |
(i) National Forest | | |
(ii) Indian Reservation | | |
(iii) Public Lands Under Jurisdiction of | | |
(iv) Other | | |
(v) Total U.S. Lands | | |
(vi) Check appropriate box:[] Surveyed land [] Unsurveyed land
(9) Construction of the project is planned to start within ____ months, and is planned to be completed within ____ months, from the date of issuance of license.