Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No. 25, LLC; Notice Announcing Preliminary Permit Drawing

Download PDF
Federal RegisterFeb 23, 2012
77 Fed. Reg. 10740 (Feb. 23, 2012)

The Commission has received four preliminary permit applications deemed filed on September 1, 2011, at 8:30 a.m., for proposed projects to be located at the U.S. Army Corps of Engineers' John C. Stennis Lock and Dam on the Tennessee-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund XVIII for Project No. 14261-000, Upper Hydroelectric, LLC for Project No. 14268-000, FFP Project 95, LLC for Project No. 14277-000, and Riverbank Hydro No. 25, LLC for Project No. 14281-000.

Under the Commission's Rules of Practice and Procedure, any document received after regular business hours is considered filed at 8:30 a.m. on the next regular business day. 18 CFR 385.2001(a)(2) (2011).

On February 28, 2012, at 9 a.m. (eastern time), the Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants identified in this notice. The Commission will select among competing permit applications as provided in section 4.37 of its regulations. The priority established by this drawing will be used to determine which applicant, among those with identical filing times, will be considered to have the first-filed application.

18 CFR 4.37 (2011).

The drawing is open to the public and will be held in room 2C, the Commission Meeting Room, located at 888 First St. NE., Washington, DC 20426. A subsequent notice will be issued by the Secretary announcing the results of the drawing.

Dated: February 16, 2012.

Nathaniel J. Davis, Sr.,

Deputy Secretary.

[FR Doc. 2012-4189 Filed 2-22-12; 8:45 am]

BILLING CODE 6717-01-P