Cal. Dept. of Toxic Subst. v. Commer. Realty

United States Court of Appeals, Ninth Circuit
Oct 25, 2002
309 F.3d 1113 (9th Cir. 2002)

Summary

holding that granting a motion to intervene in a long-litigated environmental action would, among other things, "unnecessarily prolong the litigation, threaten the parties' settlement, and further delay cleanup and development of the [Landfill]"

Summary of this case from U.S. v. Alisal Water Corp.

Opinion

Nos. 01-55630, 01-55633, 01-55636 and 01-55638.

Argued and Submitted April 3, 2002.

Filed October 25, 2002.

Lisa Bond, Richards, Watson Gershon, Los Angeles, CA, for applicants-in-intervention-appellants Cities of Buena Park, Hawthorne, Hermosa Beach, Huntington Park, Paramount, Redondo Beach, Seal Beach, South Gate and Torrance.

Jeremy G. March, Thever Associates, Los Angeles, CA, for applicant-in-intervention-appellant City of Lynwood.

Richard Motevideo and Treg A. Julander, Rutan Tucker, LLP, Costa Mesa, CA, for applicant-in-intervention-appellant City of Lawndale.

Lisa Peskay Malmsten, Deputy City Attorney, Long Beach, CA, for applicant-in-intervention-appellant City of Long Beach.

Dennis A. Ragen, Deputy Attorney General, San Diego, CA, for plaintiff-appellee California Department of Toxic Substance Control.

Andrew H. Perellis and Miles A. Zvi, Seyfarth Shaw, Chicago, IL, for defendants-appellees Commercial Realty Projects, Inc. and L.A. Metromall, LLC.

James J. Dragna and Greg A. Christianson, McCutchen, Doyle, Brown Enersen, LLP, Los Angeles, CA, for defendants-appellees Atlantic Richfield Company, Chevron U.S.A., Inc., Exxon Mobil Corp., Honeywell International Inc., Phillips Petroleum Co., Shell Chemical Co., Shell Oil Co., Southern California Gas Co., Texaco Inc., Union Oil Company of California, and Unocal Corp.

Laura J. Carroll and Jeffrey D. Wexler, Luce, Forward, Hamilton Scripps, LLP, Los Angeles, CA, for defendant-appellee Long Beach Oil Development Co.

Daniel Romano and Kenneth H. Moss, Law Offices of Daniel Romano, Los Angeles, CA, for amicus curiae City of Carson, Carson Redevelopment Agency, and Community Facilities District No. 95-1 of the City of Carson.

Appeal from the United States District Court for the Central District of California; Mariana R. Pfaelzer, District Judge, Presiding. D.C. No. CV-95-08773-MRP.

Before: FERNANDEZ, RAWLINSON, Circuit Judges, and SHEA, District Judge.

The Honorable Edward F. Shea, United States District Judge for the Eastern District of Washington, sitting by designation.


Applicants-In-Intervention/Appellants Cities of Buena Park, Hawthorne, Hermosa Beach, Huntington Park, Paramount, Redondo Beach, Seal Beach, South Gate, Torrance, Lynwood, Lawndale and Long Beach (sometimes collectively referred to as "Cities") appeal the denial of their motions to intervene in this action for recovery of environmental response costs under the Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA," 42 U.S.C. §§ 9601-75). Cities also challenge the district court's approval of a consent decree to which the parties stipulated. Because Cities' motions to intervene are untimely, we affirm the district court's order denying those motions. As Cities are not parties to this action, they are not entitled to appeal the district court's approval of the consent decree.

BACKGROUND

From 1959 to 1965, a municipal Class II rubbish disposal facility was operated at a 157-acre landfill in Carson, California (the "Landfill"). Approximately 6.6 million cubic yards of waste, some of which contained hazardous substances, were deposited at the Landfill.

In 1982, the California Department of Health Services, Toxic Substance Control Program ("DTSC") identified the waste disposed at the Landfill and estimated that 4 percent of the material could be considered hazardous. The DTSC divided the Landfill into two operable units ("OUs"): the Upper OU which includes the soil, waste zone, and the ground water immediately beneath the Landfill; and the Lower OU, which includes the ground water beneath the Upper OU.

In October 1995, the DTSC issued a Final Remedial Action Plan (the "Plan") which assigned 80% of the aggregate liability for the hazardous waste in the upper OU to generators of waste sent to the Landfill. Defendants-Appellees Atlantic Richfield Company ("ARCO"), Chevron U.S.A., Inc. ("Chevron"), Exxon Mobil Corp. ("Exxon"), Phillips Petroleum Co. ("Phillips"), Shell Chemical Co. ("Shell Chemical"), Shell Oil Co. ("Shell Oil"), Southern California Gas Co. ("Gas"), Texaco Inc. ("Texaco"), Union Oil Company of California ("Union"), and Unocal Corp. ("Unocal") (sometimes collectively referred to as "Oil Companies"), among others, were identified as potentially responsible parties for the waste. Cities were not identified as potentially responsible parties in the Plan. The Plan, however, indicated that the allocation of responsibility was "non-binding" and did not "limit strict joint, and several liability under CERCLA and other laws."

On December 27, 1995, the DTSC filed an action in federal district court against Commercial Realty Projects, Inc. and L.A. Metromall, LLC, owners of the Landfill (sometimes jointly referred to as "Landowners"), seeking recovery of environmental response costs under CERCLA and state law. On the same day, the parties lodged a consent decree ("Landowner Consent Decree") with the district court. Under the Landowner Consent Decree, Landowners agreed to establish a $26 million escrow account, which would cap Landowners' liability to fund the Plan.

On July 17, 1996, Oil Companies moved to intervene in the action against Landowners to oppose the Landowner Consent Decree which, due to the $26 million cap, potentially shifted a significant portion of the recovery response costs from Landowners to Oil Companies. On July 26, 1996, the district court denied Oil Companies' motion to intervene, which Oil Companies appealed.

On August 19, 1997, Landowners filed a separate action against Oil Companies asserting contribution claims under CERCLA, and other related claims. Beginning September 21, 1998, we stayed Oil Companies' appeal to permit the parties to pursue settlement discussions with the aid of the Ninth Circuit mediator. The Ninth Circuit mediator suspended the Ninth Circuit mediation to allow a larger group to participate in settlement negotiations under the supervision of a magistrate judge. The DTSC, Oil Companies and Long Beach Oil Development Co. ("Long Beach Oil") subsequently participated in a series of settlement conferences before the magistrate judge.

In August 1999, Oil Companies invited forty-four potentially responsible parties, including Cities, to participate in settlement negotiations with the DTSC and the Landowners. Most refused to attend. In a letter dated September 3, 1999, Oil Companies cited evidence linking Cities and the other potentially responsible parties to the Landfill, and invited those parties to a second meeting to be held on September 22, 1999, but required execution of a confidentiality agreement in order to participate. While Cities' representatives arrived for the meeting, most, if not all of the Cities refused to execute the confidentiality agreement and were not permitted to attend the meeting.

During the same time settlement negotiations were proceeding, Phillips, Union Oil, Unocal and the Shell companies submitted administrative claims under the California Tort Claims Act to Cities in relation to response cost for the Landfill. Oil Companies also served notice upon municipal waste generators of their intent to file suit under the Resource Conservation Recovery Act.

In November 1999, as part of a global settlement with the DTSC, Oil Companies submitted settlement offers to Cities for contribution toward remedial costs at the Landfill in exchange for a full release from liability and contribution protection. Cities rejected the offer. In January 2000, Oil Companies and the DTSC again invited Cities to join in global settlement discussions. Most, if not all, the Cities again refused to participate.

In February 2000, Shell, Union Oil, and Unocal filed an action in federal court against Cities and others, seeking contribution toward remedial costs at the Landfill under CERCLA, and for other legal and equitable relief. Phillips filed a similar complaint.

In May 2000, Oil Companies extended the magistrate judge's invitation to Cities to attend settlement negotiations to be conducted among Oil Companies, Landowners and the DTSC. Most, if not all, either refused to attend or declined to join in global settlement discussions. In September 2000, the DTSC and Oil Companies made a final unsuccessful attempt to include Cities in a global settlement.

In October 2000, the parties settled. On October 20, 2000, the DTSC issued a "Notice to Interested Parties" that it was seeking judicial approval of a Consent Decree to resolve DTSC's claims against Landowners, Oil Companies and others ("Oil Consent Decree"). Cities submitted comments on November 27, 2000, challenging several aspects of the Oil Consent Decree. On December 21, 2000, the district court, pursuant to a stipulation by the parties and Oil Companies, permitted the DTSC to amend its complaint to add Oil Companies as defendants.

After requiring certain modifications incorporating comments to the Oil Consent Decree, the DTSC moved for judicial approval of the Oil Consent Decree on January 5, 2001. On that same day, Cities moved, for the first time, to intervene. On March 5, 2001, the district court denied Cities' motion. On March 9, 2001, the district court entered an order granting the DTSC's motion for judicial approval of the Oil Consent Decree. On March 29, 2001, the district court entered the Oil Consent Decree. Cities filed timely notices of Appeal.

We subsequently dismissed Oil Companies' earlier appeal pursuant to a stipulation entered by the parties.

DISCUSSION

The Oil Consent decree contains the following provisions which Cities find particularly objectionable:

• Oil Companies are to pay $10 million in recovery costs, with $2 million deposited into an account for Landfill recovery costs (the "Account"), $2 million deposited into the account of attorneys for the Landowners, and $6 million deposited into the Account contingent upon Oil Companies obtaining assignment of all claims against third parties;

• Oil Companies are required to "in good faith pursue third parties to maximize, to the extent practical" recovery from third-parties;

• Oil Companies' recovery from third parties is subject to the following distribution formula: the first $6 million reimburses Oil Companies, the next $1 million defrays Oil Companies' attorney fees, and any additional funds are divided equally between the Account and Oil Companies;

• funds deposited by Oil Companies into the Account shall be considered costs incurred consistently with the National Recovery Plan ("NCP"); and

• the Oil Consent Decree resolves all claims brought by the DTSC against Oil Companies.

Unfortunately, Cities' untimely intervention prevents them from pursuing their objections on appeal.

A. Cities' Intervention Motion

Cities moved to intervene as of right pursuant to CERCLA § 113(i) [ 42 U.S.C. § 9613(i)] and Fed.R.Civ.P. 24(a). Alternatively, Cities moved for permissive intervention pursuant to Fed.R.Civ.P. 24(b). The district court denied Cities' motions for intervention because: (1) the motions were untimely, and failed to establish a legally protectable interest that was impaired; (2) the DTSC adequately protected Cities' interests; and (3) Cities' interests were more appropriately addressed through amici curiae status.

Fed.R.Civ.P. 24(a) provides for intervention of right as follows:

Upon timely application anyone shall be permitted to intervene in an action: (1) when a statute of the United States confers an unconditional right to intervene; or (2) when the applicant claims an interest relating to the property or transaction which is the subject of the action and the applicant is so situated that the disposition of the action may as a practical matter impair or impede the applicant's ability to protect that interest, unless the applicant's interest is adequately represented by existing parties.

CERCLA provides for intervention in terms nearly identical to those of Fed.R.Civ.P. 24(a)(2):

In any action commenced under this chapter or under the Solid Waste Disposal Act [ 42 U.S.C. § 6901 et seq.] in a court of the United States, any person may intervene as a matter of right when such person claims an interest relating to the subject of the action and is so situated that the disposition of the action may, as a practical matter, impair or impede the person's ability to protect that interest, unless the President or the State shows that the person's interest is adequately represented by existing parties.

CERCLA § 113(i), 42 U.S.C. § 9613(i). Due to the nearly identical language, the same standards that apply to intervention under Fed.R.Civ.P. 24(a)(2) apply to intervention under CERCLA § 113(i), with the exception that the burden to show that existing parties adequately represent the prospective intervenor's interests is allocated to the President or the State under § 113(i), whereas under Fed.R.Civ.P. 24(a)(2) the party seeking to intervene has the burden to show that no existing party adequately represents its interests. See United States v. Union Electric Co., 64 F.3d 1152, 1156-57 (8th Cir. 1995).

In United States v. State of Washington, 86 F.3d 1499, 1503 (9th Cir. 1996), we held that the district court must grant a motion to intervene, pursuant to Rule 24(a)(2), "if four criteria are met: timeliness, an interest relating to the subject of the litigation, practical impairment of an interest of the party seeking intervention if intervention is not granted, and inadequate representation by the parties to the action." (citation omitted). We review the denial of motion to intervene as of right de novo with the exception that the district court's determination of timeliness is reviewed for an abuse of discretion. Id.

Three factors should be evaluated to determine whether a motion to intervene is timely: "(1) the stage of the proceeding at which an applicant seeks to intervene; (2) the prejudice to other parties; and (3) the reason for and length of the delay." Id. (citation omitted). If we find that the motion to intervene was not timely, we need not address any of the remaining elements. Id.

In County of Orange v. Air California, 799 F.2d 535, 538 (9th Cir. 1986), we held that filing a motion to intervene filed after the parties had come to an agreement following five years of litigation should weigh heavily against intervention. We reached this holding even though the agreement had not yet been officially approved by the district court. Id. In the present case, Cities did not move to intervene until after the parties settled, more than six years after litigation commenced, and on the same day DTSC moved for judicial approval of the consent decree. Intervention at such a late stage weighs heavily against Cities.

The district court found that the parties would be prejudiced by Cities' intervention because intervention "at the final stage of this action would unnecessarily prolong the litigation, threaten the parties' settlement, and further delay cleanup and development of the [Landfill]." The district court, which presided over the complex litigation for more than six years, did not abuse its discretion in finding prejudice to the parties, since intervention by Cities would complicate the issues and upset the delicate balance achieved by the Oil Consent Decree. See State of Washington, 86 F.3d at 1504 (holding that the district court did not abuse its discretion in finding prejudice where intervention would complicate the issues, and upset a delicate balance achieved after years of litigation); United States v. State of Oregon, 913 F.2d 576, 588-89 (9th Cir. 1990) (holding that the district court did not abuse its discretion by finding prejudice when intervention was sought after settlement involving a delicate compromise following four years of negotiation, with certain points still disputed); Air California, 799 F.2d at 538 (ruling that the district court judge, who presided over the case from its inception, did not abuse his discretion when he recognized that intervention after settlement could undo five years of protracted litigation).

Considering that the first two factors weigh against intervention, In this regard, cities must convincingly explain their delay in filing their motions to intervene. Cities essentially argue that they did not delay in filing their motions for intervention, because they could not have determined that the Oil Consent Decree would affect their interests or that the DTSC would not protect their interests until they were notified of the terms of the decree.

While the length of time that has passed since a suit was filed is not, in and of itself, determinative of timeliness, "[a] party seeking to intervene must act as soon as he knows or has reason to know that his interests might be adversely affected by the outcome of the litigation." State of Oregon, 913 F.2d at 589 (emphasis added, citation and internal quotation marks omitted). While Cities were not certain that the consent decree would be adverse to their interests, they had reason to know that negotiations might produce a settlement decree to their detriment. Cities were informed of settlement negotiations with respect to the Landfill as early as August 1999. Further, on September 3, 1999, Oil Companies informed Cities of their belief that Cities were responsible for recovery costs with respect to the Landfill, and provided some evidence to support their belief. Cities should have realized that the negotiations could result in a consent decree allowing Oil Companies to look to Cities for contribution. Cities could have intervened sooner to protect themselves from this eventuality. Cities should have known that the risks of waiting included possible denial of their motions to intervene as untimely. See State of Oregon, 913 F.2d at 589 (finding intervention untimely because applicants had notice of the proceeding and were aware that their interests would be discussed in settlement negotiations); Air California, 799 F.2d at 538 (requiring applicant to intervene before settlement when the applicant was aware that the parties were attempting to reach a negotiated settlement and might look to the applicant for help towards the settlement, even though the applicant did not know the terms of the settlement).

The district court did not abuse its discretion in denying Cities' motion to intervene as untimely. See United States v. Pitney Bowes, Inc., 25 F.3d 66, 69-74 (2nd Cir. 1994) (recognizing that an untimely motion prevents intervention under CERCLA § 113(i) [ 42 U.S.C. § 9613(i)], intervention of right under Fed.R.Civ.P. 24(a), and permissive intervention under Fed.R.Civ.P. 24(b)). Further, because Cities are not parties to this litigation and do not assert any extraordinary circumstances, they cannot appeal the district court's approval of the Oil Consent Decree. See United States v. $129,374 in United States Currency, 769 F.2d 583, 590 (9th Cir. 1985) (preventing a potential intervenor from appealing the district court's order granting summary judgment).

B. Challenge to the District Court's Jurisdiction

In Citibank Int'l v. Collier-Traino, Inc., 809 F.2d 1438, 1440 (9th Cir. 1987), we intimated that a non-party could challenge a district court's lack of subject matter jurisdiction pursuant to Fed.R.Civ.P. 12(h)(3). Cities did not file such a motion, although Cities did challenge the district court's jurisdiction to approve the Oil Consent Decree because Oil Companies' appeal had not yet been dismissed. In Bennett v. Gemmill (In re Combined Metals Reduction Co.), 557 F.2d 179, 200 (9th Cir. 1977), we held that the "general rule is that once a notice of appeal has been filed, the lower court loses jurisdiction over the subject matter of the appeal." This general rule, however, refers discretely to a loss of jurisdiction over those aspects of the case involved in the appeal, and is a "judge-made doctrine designed to avoid the confusion and waste of time that might flow from putting the same issues before two courts at the same time." Kern Oil Refining Co. v. Tenneco Oil Co., 840 F.2d 730, 734 (9th Cir. 1988) (citation omitted). The divestment rule, therefore, is a rule of judicial economy and not one that strips the district court of subject matter jurisdiction. See Stein v. Wood, 127 F.3d 1187, 1189 (9th Cir. 1997); see also Shevlin v. Schewe, 809 F.2d 447, 450-51 (7th Cir. 1987); Britton v. Co-op Banking Group, 916 F.2d 1405, 1411 (9th Cir. 1990). Cities' challenge simply does not implicate the district court's subject matter jurisdiction over this matter.

C. Lack of Appellate Jurisdiction

Absent a valid challenge to the district court's subject matter jurisdiction, Cities do not otherwise have standing to appeal the district court's approval of the Oil Consent Decree. See Citibank Int'l, 809 F.2d at 1440-41 (9th Cir. 1987). Accordingly, we lack jurisdiction to consider that portion of Cities' appeal. See United States v. City of Oakland, 958 F.2d 300, 301 (9th Cir. 1992).

The district court's order denying Cities' motion to intervene is AFFIRMED. The remaining portion of Cities' appeal is DISMISSED for lack of jurisdiction.

AFFIRMED in part, DISMISSED in part.


Summaries of

Cal. Dept. of Toxic Subst. v. Commer. Realty

United States Court of Appeals, Ninth Circuit
Oct 25, 2002
309 F.3d 1113 (9th Cir. 2002)

holding that granting a motion to intervene in a long-litigated environmental action would, among other things, "unnecessarily prolong the litigation, threaten the parties' settlement, and further delay cleanup and development of the [Landfill]"

Summary of this case from U.S. v. Alisal Water Corp.

holding that granting a motion to intervene in a long-litigated environmental action would, among other things, "unnecessarily prolong the litigation, threaten the parties' settlement, and further delay cleanup and development of the [Landfill]"

Summary of this case from Lindblom v. Santander Consumer U.S., Inc.

holding that the district court did not abuse its discretion by finding that the parties would be prejudiced by intervention after settlement because intervention would, among other things, unnecessarily prolong the litigation and threaten the parties' settlement

Summary of this case from Moore v. Verizon Commc'ns Inc.

holding that the stage of the proceedings factor weighs heavily against intervenor where motion to intervene was not filed until after the parties settled following more than six years of litigation, and on the same day plaintiff moved for judicial approval of the consent decree

Summary of this case from Moore v. Verizon Commc'ns Inc.

finding intervention untimely because applicants had reason to know negotiations might produce settlement decree to their detriment yet they failed to intervene sooner

Summary of this case from United States v. Gov't of Guam

finding intervention untimely because applicants had notice of settlement negotiations and notice that they might be responsible for clean-up costs under the Comprehensive Environmental Response, Compensation, and Liability Act ("CERCLA") over a year before seeking to intervene; noting that while the intervenors "were not certain that the consent decree would be adverse to their interests, they had reason to know that negotiations might produce a settlement decree to their detriment"

Summary of this case from Moore v. Verizon Commc'ns Inc.

concluding that district court did not abuse its discretion in denying motion to intervene in a long-litigated environmental action where intervention would, among other things, "unnecessarily prolong the litigation, threaten the parties' settlement, and further delay cleanup and development of the [Landfill]"

Summary of this case from Tech. & Intellectual Prop. Strategies Grp. PC v. Insperity, Inc.

upholding the district court's determination that post-judgment intervention would prejudice the parties because it would "prolong the litigation, threaten the parties' settlement, and further delay the clean up and development of [the property at issue]"

Summary of this case from Johnson Bank v. Greenplex Invs., LLC

denying intervention in a long-litigated environmental action because it would, among other things, "unnecessarily prolong the litigation, threaten the parties' settlement, and further delay cleanup and development of the [Landfill]"

Summary of this case from Rancheria v. Salazar

affirming denial of motion to intervene based solely on untimeliness factor

Summary of this case from Scholl v. Mnuchin

affirming district court's finding of prejudice where parties had already reached a settlement agreement because late intervention would "complicate the issues and upset the delicate balance achieved" by the parties' agreement

Summary of this case from Lee v. Pep Boys- Manny, Moe & Jack of Cali.

affirming denial of motion to intervene in long-litigated environmental action which would, inter alia, "unnecessarily prolong the litigation, threaten the parties' settlement, and further delay cleanup and development of the [Landfill]"

Summary of this case from United States v. Gov't of Guam

recognizing that "a non-party could challenge a district court's lack of subject matter jurisdiction pursuant to Fed.R.Civ.P. 12(h)."

Summary of this case from The Canadian St. Regis Band of Mohawk Indians v. State

agreeing with the district court's finding of prejudice where the parties had already reached a settlement agreement, because late intervention "would complicate the issues and upset the delicate balance achieved by" the parties' agreement

Summary of this case from West Coast Seafood Processors Ass'n v. NRDC

In California Dep't of Toxic Substances Control v. Com. Realty Projects, Inc., 309 F.3d 1113, 1120 (9th Cir. 2002), the Ninth Circuit recognized that a non-party could challenge a district court's lack of subject matter jurisdiction pursuant to Fed.R.Civ.P. 12(h)(3).

Summary of this case from Diaz v. Gate Gourmet, Inc.

In California Dep't of Toxic Substances Control v. Com. Realty Projects, Inc., 309 F.3d 1113, 1120 (9th Cir. 2002), the Ninth Circuit recognized that a non-party could challenge a district court's lack of subject matter jurisdiction pursuant to Fed.R.Civ.P. 12(h)(3).

Summary of this case from Diaz v. Gate Gourmet, Inc.

setting forth factors relevant to timeliness

Summary of this case from Legacy v. U.S. Fish & Wildlife Serv.

listing the three factors

Summary of this case from Amarin Pharma, Inc. v. Hikma Pharm. U.S. Inc.

agreeing with the district court's finding of prejudice where the parties had already reached a settlement agreement, because late intervention "would complicate the issues and upset the delicate balance achieved by" the parties' agreement

Summary of this case from Munoz v. PHH Corp.

laying out factors to consider in timeliness analysis

Summary of this case from Righthaven LLC v. Democratic Underground, LLC

laying out factors to consider in timeliness analysis

Summary of this case from Righthaven LLC v. Democratic Underground, LLC
Case details for

Cal. Dept. of Toxic Subst. v. Commer. Realty

Case Details

Full title:The CALIFORNIA DEPARTMENT OF TOXIC SUBSTANCES CONTROL; The Hazardous Waste…

Court:United States Court of Appeals, Ninth Circuit

Date published: Oct 25, 2002

Citations

309 F.3d 1113 (9th Cir. 2002)

Citing Cases

Moore v. Verizon Commc'ns Inc.

A party seeking to intervene must act "as soon as he knows or has reason to know that his interests might be…

United States v. Gov't of Guam

Rule 24(a)(2)'s first requirement is the timely filing of a motion to intervene. Courts consider three…