Wis. Admin. Code Public Service Commission PSC 119.12

Current through October 28, 2024
Section PSC 119.12 - Site plan

For all categories, the applicant shall include with the application a site plan that shows the location of the interconnection disconnect switch, adjoining street name, and the street address of the DG facility. For Category 2, 3, or 4 DG facilities, the site plan shall show the location of major equipment, electric service entrance, electric meter, interconnection disconnect switch, and interface equipment.

Wis. Admin. Code Public Service Commission PSC 119.12

CR 03-003: CR Register January 2004 No. 577, eff. 2-1-04.