Section 246-272B-05100 - Construction oversight and testingThe design engineer or the engineer's authorized representative shall:
(1) Conduct inspections to:(a) Verify LOSS construction and materials conform with approved plans and specifications; and(b) Collect data for the record drawings.(2) Inspect the following: (a) Poured-in-place sewage tanks construction;(b) Installation of proprietary and public domain treatment and dispersal components;(c) Installation of LOSS components in difficult conditions including, but not limited to, steep slopes and shallow soils; and(d) Placement of sand or other fill material.(3) Conduct or witness LOSS component testing to verify that all results fall within acceptable limits: (a) Water tightness testing of all tanks under WAC 246-272B-05200; and(b) Pressure testing of all new collection and conveyance piping according to an acceptable industry standard; and either(c) Pressure and flow testing of the subsurface drip system to verify it functions properly prior to scheduling a LOSS final inspection by the department; or(d) Pressure testing of the drainfield to verify it functions properly prior to scheduling a LOSS final inspection by the department.(4) Record baseline pressure and flow information and provide passing results to the department during the final inspection.Wash. Admin. Code § 246-272B-05100
Statutory Authority: RCW 70.118B.020. 11-12-035, § 246-272B-05100, filed 5/25/11, effective 7/1/11.