Wash. Admin. Code § 137-12A-030
Statutory Authority: RCW 72.01.090. 91-10-018, § 137-12A-030, filed 4/23/91, effective 5/24/91. Statutory Authority: RCW 72.01.090 and 1984 c 246 § 2. 84-14-077 (Order 84-10), § 137-12A-030, filed 7/2/84. Statutory Authority: RCW 72.02.040 and 72.72.040. 84-06-009 (Order 84-03), § 137-12A-030, filed 2/27/84.