Wash. Admin. Code § 136-20-060

Current through Register Vol. 24-22, November 15, 2024
Section 136-20-060 - Engineer's report

Each county engineer shall furnish the county legislative authority with a written report of the findings of the bridge inspection effort. This report shall be made available to said authority and shall be consulted during the preparation of the proposed six-year transportation program revision. The report shall include the county engineer's recommendations as to replacement, repair or load restriction for each deficient bridge. The resolution of adoption of the six-year transportation program shall include assurances to the effect that the county engineer's report with respect to deficient bridges was available to said authority during the preparation of the program. It is highly recommended that deficient short span bridges, drainage structures, and large culverts be included in said report.

Wash. Admin. Code § 136-20-060

Amended by WSR 14-17-035, Filed 8/13/2014, effective 9/13/2014

Statutory Authority: Chapter 36.79 RCW. 99-01-021, § 136-20-060, filed 12/7/98, effective 1/7/99. Statutory Authority: RCW 36.78.070 and 36.79.060. 96-17-013, § 136-20-060, filed 8/12/96, effective 9/12/96. Statutory Authority: RCW 36.78.070. 91-21-136 (Order 83), § 136-20-060, filed 10/23/91, effective 11/23/91; 90-17-075 (Order 78), § 136-20-060, filed 8/16/90, effective 9/16/90. Statutory Authority: Chapter 36.78 RCW. 79-01-099 (Order 36), § 136-20-060, filed 1/3/79; Order 28, § 136-20-060, filed 5/4/76; Order 26, § 136-20-060, filed 5/6/75; Order 22, § 136-20-060, filed 4/19/73; Order 11, § 136-20-060, filed 10/9/69.