Current through Register Vol. 63, No. 11, November 1, 2024
Section 603-051-0829 - Refusal or Cancellation of CertificationCertification may be refused or cancelled in accordance with the following:
(1) Failure to meet or maintain the requirements of these regulations.(2) Any planting in which off-type plants are found to exceed 0.2 percent may be refused certification unless said planting has been established in a manner that would permit all off-type plants to be safely removed.(3) Any planting found to be infected with a serious systemic pathogen or suspected of such infection may be required to be rogued or may be refused for further propagation. Any planting in which a plant is found to be infected with such systemic pathogens may be refused certification except when the total of such infected plants in a certified block does not exceed 0.5 percent.(4) Failure to meet the pest cleanliness requirements for Oregon nursery stock.(5) Any planting found to be infested with cyclamen mites or infected with: (a) Stem and bulb nematodes; orOr. Admin. Code § 603-051-0829
AD 965(3-72), f. 2-24-72, ef. 3-25-72; Renumbered from 603-051-0829.06Stat. Auth.: ORS 561.190 & ORS 633.620 - ORS 633.660
Stats. Implemented: ORS 633.620 - ORS 633.660