Current through Register Vol. 56, No. 21, November 4, 2024
Section 5:18-1.5 - Inspection of LPG systems by the Division(a) All LPG systems of greater than 2,000 gallons water capacity vapor delivery service, all liquid withdrawal service systems, and all fill plants shall be inspected annually by the Division, with the exception of LPG systems meeting the requirements of N.J.A.C. 5:18-9, which shall be subject to a triennial audit, and those subject to local inspection, as set forth in N.J.A.C. 5:18-1.2(c).(b) Upon successful completion of an initial inspection by the Division, a site-specific certificate of operation shall be issued.(c) The certificate of operation shall indicate that the LPG system is in compliance with the applicable requirements of this chapter and shall be posted at a conspicuous location where representatives of the Division and members of the public may inspect it.(d) Failure to remove any violations found as a result of an inspection made by the Division shall result in issuance of a written notice to abate the violations. Correction of violations shall be done in accordance with N.J.A.C. 5:18-7.3.N.J. Admin. Code § 5:18-1.5
Amended by 52 N.J.R. 679(a), effective 4/6/2020