Mich. Admin. Code R. 299.2436

Current through Vol. 24-19, November 1, 2024
Section R. 299.2436 - Plugging records; contents and filing

Rule 2436.

(1) Except as provided in subrule (2) of this rule a permittee shall file, within 60 days after plugging, the final plugging forms, which shall include all of the following information:
(a) The type of cement and number of sacks used, including the additives and percentages of the additives for each cement bridge plug.
(b) The type and volume of plugging material used if other than cement.
(c) The number of bridge plugs set in the hole and the depth and length of each plug.
(d) All downhole equipment abandoned with the hole and the depths to the tops of the abandoned equipment.
(e) Signed copies of service companies' records of cementing operations showing all of the following information:
(i) Pumping times.
(ii) Placement of cement.
(iii) Weights of cement slurries.
(iv) Pumping rates.
(v) Other pertinent data related to the plugging operations.
(f) The amounts and type of mix water used to mix cement.
(g) The volume and types of spacers and flushes used.
(h) The permittee's daily plugging records, if available.
(2) If a test well is drilled in an area of the state where rocks of precambrian age directly underlie unconsolidated surface deposits or in those areas that have been designated by the provisions of section 62508(c) of the act, an owner shall file the information required in subrule (1) of this rule within 2 years after drilling completion.

Mich. Admin. Code R. 299.2436

2004 AACS