Eligible energy conservation measures are those which a) meet the cost effectiveness test of simple payback of between two (2) and ten (10) years; b) the type(s) and quantity(ies) of energy to be saved with weighted adjustments; c) the quality of the Technical Assistance Report; and d) the potential for the use of renewable resources. For Technical Assistance projects, priority is based upon the energy conservation potential of each building.
Ga. Comp. R. & Regs. R. 267-5-.07
O.C.G.A. Sec. 28-5-122.