30 C.F.R. § 75.519-1

Current through October 31, 2024
Section 75.519-1 - Main power circuits; disconnecting switches; locations

Section 75.519 requires (a) that a disconnecting switch be installed on the surface at a point within 500 feet of the place where the main power circuit enters the underground area of a mine, and (b) that, in an instance on which a main power circuit enters the underground area through a shaft or borehole, a disconnecting switch be installed underground within 500 feet of the bottom of the shaft or borehole.

30 C.F.R. §75.519-1