Opinion
As part of the excavation work in the construction of a school, the defendant, a subcontractor, undertook to dig a ditch from the dormitory to the administration building. The ditch was being dug in thirty-foot sections, and, after conduits and a water main were laid in it by H, the general contractor, the defendant backfilled the ditch. The plaintiff, an employee of H, was working in the third section when, because of wet conditions, the defendant's backhoe operator was ordered by the defendant's supervisor to dig a lateral trench to drain the water from that section. Later that day, the plaintiff was injured while he was working at a depth of about six feet in the fourth section, which was wet on the bottom from water seeping in through the sides, when the side of the ditch caved in on him. At that time, the backhoe operator was at the site. Minor cave-ins had occurred on the day of and prior to the accident. The subcontract required the defendant to notify H to install supports or shoring to brace the sides of the ditch when the defendant deemed it necessary. No such notification was given. Since the jury, on the basis of these and other relevant facts which they could reasonably have found, could reasonably have concluded that at the time of the accident the defendant, either alone or jointly with H, was in control of the ditch, that the defendant's employees had an opportunity to observe the prevailing wet conditions in the ditch and should have realized the necessity for shoring, and that the defendant should have notified H of the need for shoring the aides of the ditch or should have warned the plaintiff of the existing danger, held that the court was justified in refusing to set aside the verdict for the plaintiff. The issue whether H or the defendant was in control of the ditch was properly submitted to the jury since on the evidence honest and reasonable men could fairly reach different conclusions on this issue. Considering the charge as a whole and the claims of the parties, there was a sufficient basis for the court's charge as to the defendant's duty to use care if there existed foreseeability that harm could result without it since, before stating the rule, the court charged that the duty to exercise reasonable care arose when the, activities of two persons came so in conjunction that failure to exercise reasonable care by one was likely to cause injury to the other. Where, after exception was taken to the original charge that, as a matter of law, the defendant was in control of the ditch, the jury were given further instructions, which met with the approval of the defendant's attorney, that it was for them to determine whether the defendant was in fact in charge of the excavation of the ditch, the defendant could not on appeal claim error on the correctness of the charge on the question of control of the ditch. There was no error in the court's refusal to charge as requested in regard to shoring and control of the ditch since the requests failed to take into account the plaintiff's claim that the duties as to shoring were divided between H, who was to install it, and the defendant, who was to notify H of the need for shoring, and the probability that H and the defendant were both exercising control. Since the contractual relations between the defendant and H were governed by the subcontract, the court correctly excluded from evidence the general contract between H and the school. As the parties agreed that H was obligated to install the shoring when it was needed, evidence of shoring installed by H after the accident offered to prove control was properly excluded. The court did not abuse its discretion in allowing the plaintiff, during the trial, to amend his complaint by enlarging the specifications of negligence more nearly to conform to the proof since no new issue was injected. The court's refusal to permit the defendant to add a third special defense setting up the provisions of the Workmen's Compensation Act which would have injected a new issue into the case and would not have been a valid defense to the present action was correct.
Argued December 8, 1967
Decided February 9, 1968
Action to recover damages for personal injuries, alleged to have been caused by the negligence of the defendant, brought to the Superior Court in Litchfield County and tried to the jury before Speziale, J.; verdict and judgment for the plaintiff and appeal by the defendant. No error.
William W. Sprague and John R. Fitzgerald, for the appellant (defendant).
William J. Secor, Jr., with whom, on the brief, were Donald McPartland and John H. Cassidy, Jr., for the appellee (plaintiff).
The plaintiff brought this action to recover damages for personal injuries alleged to have been sustained by him when a ditch in which he was working caved in on him. The jury returned a verdict for the plaintiff, and from the judgment rendered thereon the defendant has appealed.
The plaintiff claimed to have proved the following facts: On April 1, 1964, the plaintiff was an employee of Hirsch Brothers, Inc., hereinafter referred to as Hirsch, which had contracted with Wykeham Rise School for Girls to construct and repair buildings on the school property. Hirsch hired the plaintiff in September, 1963, and assigned him to the Wykeham Rise School job in October, 1963. His duties included helping with demolition, form work and footings, and assisting electricians and plumbers.
Hirsch subcontracted to the defendant the excavation work on the Wykeham Rise School job. The defendant commenced that work late in the fall of 1963, using its own equipment. The work included digging and backfilling a trench from the school's dormitory to the administration building, a distance of 200 to 300 feet, for the purpose of laying conduits and a water main between the two buildings. The defendant's work did not include the actual laying of the conduits and water main. The agreement between Hirsch and the defendant was that, if in the opinion of the defendant supports or shoring was needed to brace the sides of the ditch in question, the defendant was to notify Hirsch of the need, and Hirsch would then have its carpenters install the shoring and supports necessary.
On April 1, 1964, Frank Rinaldi, a backhoe operator employed by the defendant, commenced digging the ditch. He dug a section approximately thirty feet long, seven feet wide at the top and four and one-half feet deep. After this section of the ditch was dug, the plaintiff and three other Hirsch employees placed conduits in it, fastened them together and pulled the necessary wires through the conduits. While they were so engaged, Rinaldi did not operate the backhoe. After the plaintiff and the other Hirsch employees completed their work, Rinaldi dug a second thirty-foot section, and the plaintiff and the other Hirsch employees performed the same work as they had done in the first section. After the Hirsch employees completed their work in the second section, Rinaldi dug a third thirty-foot section, which was about six feet deep. The Surface of the ground adjacent to each side of the third section was damp, muddy and sloppy, water seeped into the ditch from its sides, and the floor of the ditch was muddy and contained water. Theodore J. Anderson, the defendant's supervisor, saw the third section of the trench and directed Rinaldi to dig a lateral trench leading out of the third section in order to drain the water from it.
The plaintiff and the other Hirsch employees finished their work in the third section at noontime and stopped for lunch. They returned at 12:30 p.m. and entered a fourth section which had been excavated by Rinaldi. This section was approximately six feet deep, water was seeping through the sides, and the floor was wet and muddy. While the plaintiff was in this section of the ditch, a side of it caved in, causing him the injuries which are the basis of this action. At the time of the accident, Rinaldi was sitting on the backhoe, which was not in operation, about thirty to forty feet from the plaintiff.
The defendant has assigned as error the refusal of the court to include certain claims of proof in the finding. A finding in a case tried to the jury is merely a narrative of the facts claimed to have been proved by each side, made for the purpose of fairly presenting any claimed errors in the charge or rulings of the court. Morgillo v. Evergreen Cemetery Assn., 152 Conn. 169, 172, 205 A.2d 368; State v. Whiteside, 148 Conn. 208, 214, 169 A.2d 260, cert. denied, 368 U.S. 830, 82 S.Ct. 52, 7 L.Ed.2d 33. Where a party seeks additions to its own claims of proof in a case tried to the jury, the additions should be made if they are material and are supported by the evidence. Phoenix Mutual Life Ins. Co. v. Brenckman, 148 Conn. 391, 394, 171 A.2d 194. The finding is accordingly corrected by adding to it certain facts from the defendant's draft finding which we have included in our following statement of the defendant's claims of proof.
The finding as corrected discloses that the defendant claimed to have proved the following facts: The digging by the defendant was to be done under the supervision of Hirsch. The defendant was expected to live up to the specifications in the contract between Hirsch and the trustees of Wykeham Rise School. The defendant had no authority to order Hirsch employees to do or not to do anything. Shoring was not included in the term "excavation work" as used by Hirsch. There was no arrangement with the defendant on shoring, and the defendant was not obligated to give notice of any need for shoring. If shoring had been ordered, Hirsch employees would have installed it. William L. Hirsch came to the ditch at different times during the day and inquired as to its progress. He was in the ditch ten minutes before the accident, and, although he noted it was muddy, he made no observations as to its safety. Rinaldi gave no orders or instructions to the plaintiff or to other Hirsch employees. Although the plaintiff knew before he entered the ditch that it was muddy and that water was seeping out of the ground, he never requested that the ditch be shored nor discussed shoring on April 1, 1964. During the morning, minor sections of the ditch walls had caved in. The cave-in which injured the plaintiff involved a section of earth four or five inches wide and three or four feet in length.
In addition to the assignment of error in the finding, the defendant assigns error in the refusal of the court to set aside the verdict, in rulings on evidence, in the refusal to charge as requested, in the charge as given, in granting the plaintiff's motion to amend his complaint, and in denying the defendant's motion to amend its answer by adding a third special defense.
The principal claim of the defendant is that it is not liable for the plaintiff's injuries because at the time they occurred Hirsch, and not the defendant, was in control of the ditch where the cave-in took place. The established general rule is that where the owner of premises employs an independent contractor to perform work upon them, the contractor, and not the owner, is liable for any losses resulting from negligence in the performance of the work until such time as it has been completed, turned over to and accepted by the owner. Trainor v. Frank Mercede Sons, Inc., 152 Conn. 364, 368, 207 A.2d 54; Mann v. Leake Nelson Co., 132 Conn. 251, 254, 43 A.2d 461. After such acceptance, the contractor is ordinarily no longer liable. Bogoratt v. Pratt Whitney Aircraft Co., 114 Conn. 126, 142, 157 A. 860; see, generally, notes, 13 A.L.R.2d 191, 58 A.L.R.2d 865. The rule is also applicable to a subcontractor and a contractor. Nuzzo v. Connecticut Steel Co., 147 Conn. 398, 400, 161 A.2d 791. Where the evidence on the question as to who had control of the area or instrumentality causing the injury is such that the mind of a fair and reasonable man could reach but one conclusion as to the identity of the person exercising control, the question is one for the court, but, if honest and reasonable men could fairly reach different conclusions on the question, the issue should properly go to the jury. Trainor v. Frank Mercede Sons, Inc., supra, 369.
The court charged the jury on the issues involved in the case, and the defendant took two exceptions to the charge as given by the court. The defendant assigns error in other portions of the charge, but we will consider only the portions to which exceptions were taken. The defendant's first exception was directed to the portion of the charge dealing with the foreseeability that harm may result if reasonable care is not exercised. In this respect the court charged the jury as follows: "The ultimate test of the existence of a duty to use care is found in the foreseeability that harm may result if it is not exercised. The test is: would the ordinary man, in the defendant's position, knowing what it knew or should have known, anticipate that harm of the general nature of that suffered by the plaintiff was likely to result unless reasonable care was taken." This is a correct statement of the law. Petrizzo v. Commercial Contractors Corporation, 152 Conn. 491, 499, 208 A.2d 748; Worden v. Francis, 148 Conn. 459, 465, 172 A.2d 196; Borsoi v. Sparico, 141 Conn. 366, 369, 106 A.2d 170. Indeed, the defendant does not claim that this statement is incorrect in law. Its claim is that, before the duty to exercise reasonable care arises, there must be proof of the existence of a relationship between the parties which gives rise to the duty. Before stating the rule on foreseeability of harm, the court charged the jury that the duty to exercise reasonable cue arises when the activities of two persons come so in conjunction that failure to exercise reasonable care by one is likely to cause injury to the other. Thus, the court defined the circumstances under which the duty arises. Borsoi v. Sparico, supra, 370. When it is considered in conjunction with the claims of the parties and the charge as a whole, there existed a sufficient basis for the application of the rule to which the defendant took exception.
The defendant's second exception to the charge was based on, and limited to, the claim that the court instructed the jury that as a matter of law the defendant was in charge of the ditch and thus in control of it. After the exception was taken, the court recalled the jury and instructed it that it was for the jury to determine whether the defendant was in fact in charge of the excavation of the ditch. The defendant's attorney then stated that he had no exception to the charge then given by the court, but he preserved his other exception to the charge relative to duty and foreseeability. Under the circumstances, the defendant may not on this appeal claim error based on the correctness of the court's charge on the question of control of the ditch. Practice Book 249, 652; Vivenzio v. Heller, 131 Conn. 406, 407, 40 A.2d 194; see also State v. Grimes, 154 Conn. 314, 323, 228 A.2d 141.
The defendant assigns error in the refusal of the court to charge the jury in accordance with three requests to charge. Each of the first two requests was based on the assumption that all duties in regard to shoring were either on Hirsch or on the defendant. Neither request took into account the plaintiff's claim that the duties as to shoring were divided between Hirsch and the defendant, so that, although Hirsch was responsible for the actual construction of shoring, the defendant was obligated to notify Hirsch whenever in its opinion shoring was needed. Thus, both requests were inadequate, and the court did not err in refusing to charge in accordance with them.
The defendant's third request was that the court charge the jury that the defendant would not be liable for the absence of shoring unless the defendant, and not Hirsch, was in control of the ditch at the time of the accident. The request did not take into account the claim of the plaintiff that the agreement between the defendant and Hirsch was to the effect that if, in the defendant's opinion, supports or shoring was needed to brace the sides of the ditch, the defendant was to notify Hirsch of the need, and Hirsch would then install the shoring and supports. Furthermore, this request was based on the assumption that either Hirsch or the defendant was in control of the ditch to the exclusion of the other at the time of the accident. To be entitled to recover, it was not necessary for the plaintiff to prove that the defendant was in control of the ditch to the exclusion of Hirsch. The defendant is liable to the plaintiff for negligence if the trier finds either that the defendant alone was in control of the ditch or that the defendant and Hirsch were both in control of it. Kaplan v. Merberg Wrecking Corporation, 152 Conn. 405, 417, 207 A.2d 732; Staples v. Bernabucci, 119 Conn. 443, 448, 450, 177 A. 380. The defendant's request to charge did not take into account the probability, which is apparent from the claims of proof, that Hirsch and the defendant were both exercising control over the ditch at the time of the accident. Upon the claims of proof, the court properly refused to charge in accordance with this request.
The defendant assigns error in certain rulings on the admissibility of evidence. The defendant sought to introduce into evidence the contract between the school and Hirsch. The defendant claimed that the terms of that contract controlled the obligations between Hirsch and its subcontractors. The court excluded the contract. The controlling contract was the one entered into between Hirsch and the defendant. There was no dispute concerning the terms of this contract except as to whether the agreement between Hirsch and the defendant was to the effect that, if in the defendant's opinion supports or shoring was needed to brace the sides of the trench, the defendant would notify Hirsch of this need, and Hirsch would then install the necessary shoring and supports. Nor was there any dispute as to whether the defendant was doing the work in accordance with the specifications of the contract between Hirsch and the school. The court did not err in excluding the contract.
The other assigned error in the admissibility of evidence was the court's action in sustaining objections to questions asked of Howard Schiffres, a witness for the plaintiff, designed to elicit information as to shoring which was constructed in the trench after the accident. The defendant claimed that the evidence was admissible to establish who was in control of the ditch, under the rule of cases such as Williams v. Milner Hotels Co., 130 Conn. 507, 510, 36 A.2d 20, which hold that evidence of repairs is admissible for the purpose of proving control. In the present case, the question is who was in control of the ditch at the time of the cave-in. The plaintiff and the defendant both agree that Hirsch was obligated to install shoring whenever it was needed. Consequently, the fact that Hirsch installed shoring after the accident would have no probative value on the question of control of the ditch at the time of the cave-in, as Hirsch did what both the plaintiff and the defendant concede Hirsch was required to do in the execution of the contract with the defendant. The court properly sustained the objections to the questions.
The defendant assigns error in the allowance of an amendment to the complaint by the plaintiff during the trial and in the refusal of the court to permit the defendant to amend its answer to allege a third special defense. Under the statutes and rules of practice, the court may in its discretion, in a proper case, allow the filing of amendments to pleadings before, during and after trial. General Statutes 52-130; Practice Book 132, 134; Thibault v. Frechette, 135 Conn. 170, 173, 62 A.2d 863. The allowance of an amendment during the course of trial lies within the sound discretion of the trial court. Antonofsky v. Goldberg, 144 Conn. 594, 598, 136 A.2d 338; Yavis v. Sullivan, 137 Conn. 253, 263, 76 A.2d 99. Our rules of practice further specifically provide that in all cases of any material variance between allegation and proof, an amendment may be permitted at any stage of the trial. Practice Book 134. The amendment offered by the plaintiff and allowed by the court merely enlarged the specifications of negligence to conform more nearly to the proof which had been offered. The amendment did not inject into the case anything foreign to the issues in the original complaint, which required proof of facts which the defendant could not meet during the normal course of the trial. We cannot say that the trial court abused its discretion in allowing the amendment. Nor can we say that the court erred in refusing to permit the defendant to amend its answer during the trial by adding a third special defense. By the proposed amendment, the defendant attempted to set up the provisions of the Workmen's Compensation Act as a defense to this action. The amendment, if allowed, would have injected into the case a new issue which required evidence different in character from the evidence required to meet the issues already in the case. The plaintiff could not reasonably be expected to produce such evidence during the trial of the case. Furthermore, the amendment, if allowed, would not constitute a defense to the action. As between all persons in the mutual relationship of employer and employee who have accepted the provisions of the Workmen's Compensation Act, the right to obtain and the liability to pay compensation under the act is substituted for the common-law rights and liabilities otherwise existing between them to the exclusion of the latter. Hoard v. Sears Roebuck Co., 122 Conn. 185, 188, 188 A. 269. We have consequently held that an employee of a subcontractor cannot sue the principal contractor at common law when the circumstances of the injury are such that the employee would have a right to recover workmen's compensation from the principal contractor. Kasowitz v. Mutual Construction Co., 154 Conn. 607, 614, 228 A.2d 149; Gigliotti v. United Illuminating Co., 151 Conn. 114, 118, 193 A.2d 718; Farrell v. L. G. DeFelice Son, Inc., 132 Conn. 81, 89, 42 A.2d 697. In the case before us, the plaintiff was an employee of Hirsch. The defendant was a subcontractor of Hirsch. There did not exist between the plaintiff and the defendant any mutual relation of employer and employee such as would exempt the defendant from liability outside the terms of the Workmen's Compensation Act. Wells v. Lavitt, 115 Conn. 117, 122, 160 A. 617. Under the facts of the present case, the defendant would not be liable to the plaintiff under the provisions of the Workmen's Compensation Act, and it cannot successfully interpose the provisions of the act as a defense. In refusing to permit the defendant to amend its answer by adding a third special defense, the court did not abuse its discretion, as the proposed amendment did not constitute a defense to the action, and it was not timely offered.
Finally, we consider the defendant's claim that the verdict is not supported by the evidence. This claim is tested by the evidence set forth in the appendices to the briefs. Lucier v. Meriden-Wallingford Sand Stone Co., 153 Conn. 422, 427, 216 A.2d 818. There was evidence from which the jury could have found the following facts: The defendant was employed as a subcontractor to dig a ditch at the Wykeham Rise School and to backfill it after conduits and a water main were laid in it. The ditch was being dug in thirty-foot sections by Rinaldi, the defendant's backhoe operator, and as each section was dug, the plaintiff and other employees of Hirsch laid conduits in it. The bottom of the third section was wet and muddy, and Anderson, a supervisor employed by the defendant, ordered Rinaldi to dig a lateral trench to drain the water from the third section. While the Hirsch employees were having lunch, Rinaldi dug a fourth section of the ditch. This section also had a wet bottom and was very sloppy, with water seeping in through the sides. The defendant did not notify Hirsch that shoring was necessary, in accordance with its agreement so to do. During the morning there had been minor cave-ins prior to the accident when dirt fell into the ditch. As the plaintiff was working in the fourth section of the ditch, a portion of the side of the ditch caved in on him. The sides of the ditch had not been shored up, and the Hirsch employees were not warned not to enter the ditch. At the time of the accident, the backhoe was not in operation, but Rinaldi was present at the site. Anderson had observed the wet and muddy condition of the area through which the ditch was being dug and knew that dampness on the sides or bottom of the ditch was likely to cause it to cave in. The jury could reasonably have concluded that at the time of the accident the defendant, either alone or jointly with Hirsch, was in control of the ditch; that the defendant's employee while digging the ditch had an opportunity to observe the condition of the soil, the seepage of water into the ditch, and the mud at the bottom of the ditch; that he should have realized that the ditch was unsafe unless it was shored up; and that he either should have notified Hirsch of the need for shoring or should have warned the plaintiff of the danger before the plaintiff entered the ditch. The evidence reasonably supports the verdict of the jury.