This matter is before the court on Defendant and Third-Party Plaintiff PacifiCorp's Motion for Partial Summary Judgment against Salt Lake Valley Sand Gravel, Inc.'s ("SLVSG"). The court held a hearing on the motion on October 18, 2005. At the hearing, PacifiCorp was represented by Rick Rose, and Third-Party Defendant SLVSG was represented by Tim Dunn and Rick Sorensen. Having fully considered the motion and memoranda submitted by the parties and the facts and law relevant to this motion, the court enters the following Memorandum Decision and Order granting PacifiCorp's motion.

BACKGROUND

Plaintiff Frank Snyder, an employee of Third-Party Defendant Salt Lake Valley Sand and Gravel ("SLVSG"), was burned when a crane boom operated by his son made contact with an overhead power line, which was owned by Defendant and Third-Party Plaintiff PacifiCorp. Snyder was standing on the transport trailer handling the lifting chain and hook that would be attached to the wreckage when the crane boom made contact with the overhead power line.

After receiving benefits under SLVSG's workers' compensation insurance for his injuries, Snyder filed this lawsuit against PacifiCorp alleging that PacifiCorp owed him a duty to design, construct, and maintain its electric transmission lines, protecting system, and grounding system in such a manner as to avoid injuries to others, including him. Snyder alleges that "[w]hen the crane's boom or cable contacted [PacifiCorp's] power line, [PacifiCorp's] protection and/or grounding system failed to de-energize the line, and that failure resulted in serious injuries to Plaintiffs." Compl. ¶ 7.

PacifiCorp, in turn, filed a Third-Party Complaint against SLVSG for indemnification, alleging that SLVSG failed to notify it that Snyder would be performing work near overhead power lines as required by the High Voltage Overhead Lines Act ("HVOLA"), Utah Code Annotated Section 54-8c-2 (2000). The HVOLA requires notification to the public utility of all work to be performed near overhead power lines and, in the absence of notice, indemnification of the public utility for "all liability incurred." Id. "No person or thing may be brought within 10 feet of any high voltage overhead line unless: (a) a responsible party has notified the public utility operating the high voltage overhead line of the intended activity; and (b) a responsible party and the public utility have completed mutually satisfactory precautions for the activity." Id. § 54-8c-2(1). It is undisputed that prior to the accident, SLVSG did not notify PacifiCorp that Snyder would be performing work near the overhead power lines in question.

SLVSG previously moved the court to dismiss PacifiCorp's Third-Party Complaint on the grounds that it was barred by the exclusive remedy provision of the Utah Workers' Compensation Act ("WCA"). The court ruled that the WCA's exclusive remedy provision did not bar PacifiCorp's indemnity claim brought pursuant to the HVOLA.

PacifiCorp now moves the court for partial summary judgment against SLVSG arguing that there is no genuine issue of material fact that SLVSG failed to comply with the notice requirement of the HVOLA and was a responsible party as defined in the HVOLA.

DISCUSSION

The main dispute in this case is whether the HVOLA requires SLVSG to indemnify PacifiCorp. First, therefore, the court must determine whether SLVSG is a responsible party under the HVOLA subject to the notification requirements. A "responsible party" is defined under the HVOLA as "any person who contracts to perform, is responsible for the performance of, or has control over any function or activity at any location." Utah Code Ann. § 54-8c-1(6).

SLVSG argues that genuine issues of material fact exist with regard to whether SLVSG had control over the work performed by Snyder. Snyder's brother testified that the accident should have never happened and that Frank should have known better. David Balls also testified that Frank Snyder told him that it was his "own damn fault." SLVSG claims that this evidence creates a disputed issue of fact with respect to whether Snyder was working within the scope of his employment.

The issue, however, is not whether Snyder was acting within the course and scope of his employment but whether SLVSG is a responsible party under HVOLA. It is undisputed that Snyder was conducting work he generally performs for SLVSG, the incident occurred on SLVSG's property, during work hours, while Snyder was on the clock, and Snyder was ordered to perform the work by his supervisor. SLVSG was responsible for the work being performed and in control of such work. Therefore, the court concludes that the undisputed facts in the record demonstrate that SLVSG was a responsible party as a matter of law.

It is further undisputed that SLVSG did not provide the required notification to PacifiCorp. In the absence of the required notification, the HVOLA requires the responsible party to indemnify the utility. "A responsible party is liable to the public utility operating a high voltage overhead line for all . . . liability incurred by the public utility as a result of any contact if: (a) the responsible party causes, permits, or allows a function or any activity in violation of any provision of this chapter; and (b) as a result, a physical or electrical contact with a high voltage overhead line occurs. Id. § 54-8c-4.

In this case, SLVSG and its employees operated equipment within 10 feet of the high voltage overhead line because the crane boom actually contacted the overhead line. And, as a result of that contact, Snyder was injured.

SLVSG, however, contends that the statutory indemnification provision in HVOLA should be construed in the same manner as a contractual indemnity provision and, under Utah law, the indemnity provisions in the HVOLA are not specific enough to require it to indemnify PacifiCorp for PacifiCorp's negligence and strict liability. The Utah Supreme Court has determined that a contractual indemnification provision "which purports to make a party respond for the negligence of another should be strictly construed." Freund v. Utah Power Light Co., 793 P.2d 362 (Utah 1990). The court has further stated that "we will not infer an intention to indemnify against other kinds of liability, including strict liability, where such intention is not clearly expressed." Bishop v. GenTec, Inc., 2002 UT 36, ¶ 19.

Although SLVSG asserts that the HVOLA provides only a general indemnification and does not clearly and expressly state that a responsible party is liable for a utility's own acts of negligence and strict liability, the HVOLA broadly states that the responsible party must indemnify the public utility "for all liability incurred." This language has been interpreted by other courts interpreting similar statutes to require indemnity even when the utility is negligent. See Tucson Elec. Power Co. v. Dooley-Jones, 746 P.2d 510, 512 (Ariz.Ct.App. 1988) ("[T]he legislature intended that utilities in situations such as the one in this case be indemnified even if they were also negligent."); Moore v. Southwestern Elec. Power Co., 737 F.2d 496, 500 (5th Cir. 1984); Travelers Ins. Co. v. Panama-WIlliams, Inc., 424 F. Supp. 1156, 1162 (N.D. Okl. 1976). To read the HVOLA otherwise would render it meaningless. If the utility is not found negligent, it has no liability and does not need indemnity.

Requiring a responsible party to indemnify the utility for its own negligence is justified because the "person or entity performing the work is in the best position to prevent the injury — whether caused by its negligence or that of the utility — by giving notice so that appropriate protective measures may be taken." Tucson Elec. Power Co. v. Swengel-Robbins Const. Co., 737 P.2d 1385, 1387 (Ariz. 1987). In other words, if the provisions of the HVOLA are followed, no accident would occur regardless of whether the utility was negligent. Thus, even if PacifiCorp's conduct could be construed as negligent, it is entitled to be indemnified as a matter of law under the provisions of the HVOLA.

SLVSG further analogizes the Governmental Immunity Act to the HVOLA and asserts that if municipal utilities are not entitled to indemnification with regard to the municipality's own negligence then neither is PacifiCorp. See Laney v. Fairview City, 2002 UT 79 (determining that a municipality is not immune from suit based on the Governmental Immunity Act if a municipal utility is negligent in maintaining power lines.). However, the court does not find these cases relevant to a determination of SLVSG's potential indemnity obligation to PacifiCorp because of the differences between the HVOLA and the Government Immunity Act.

Under the provisions of the HVOLA, SLVSG argues that if the public utility is negligent in maintaining its lines, the responsible party is not obligated to pay for precautions. The HVOLA provides that responsible parties are "obligated to pay to the public utility operating the high voltage overhead line the cost of mutually satisfactory precautions, except if:. . . . (b) the public utility operating the line has not installed the line in conformance with the National Electric Safety Code or its preceding code in effect at the time the line was constructed." Utah Code Ann. § 58-8c-2(5).

This section of the HVOLA, however, pertains to the payment of necessary protective measures once appropriate notice is given to the utility. It does not pertain to the responsible party's indemnity obligations as a result of not giving the utility notice of work taking place within ten feet of the power line. If the responsible party notifies the public utility that it may perform work within the vicinity of the power line, both the responsible party and the public utility are obligated to take "mutually satisfactory precautions." Utah Code Ann. § 54-8c-2. The responsible party is obligated to pay for the cost of such precautions unless "the public utility . . . has not installed the line in conformance with the National Electric Safety Code." Id. This exception, however, does not relate to the responsible party's obligation to indemnify the utility for "all liability incurred" if the responsible party fails to properly notify the public utility of the proposed work.

At the hearing on this matter, SLVSG raised for the first time the argument that SLVSG need not notify PacifiCorp under the requirements of the HVOLA because it did not "intend" that Snyder would conduct work within ten feet of the high voltage overhead line. The Texas Court of Appeals rejected a party's argument that the word "possible" in a similar Texas statute was unconstitutionally vague and found that summary judgment was proper not because the worker "might possibly have brought material within six feet of the line, but because he did so." Chavez v. City of San Antonio, 21 S.W.3d 435, 440 (Tex.Ct.App. 2000) (emphasis in original).

Likewise, this court finds SLVSG's argument regarding intent unpersuasive. SLVSG intended that the work be completed and it was ultimately responsible for and in control of the work. When the work proceeded to occur near the power line, SLVSG had a duty to stop work and notify PacifiCorp. Because it is undisputed that SLVSG did not notify PacifiCorp of such work, SLVSG is liable to PacifiCorp for all liability incurred by PacifiCorp as a result of Snyder's alleged injuries from the contact with PacifiCorp's high voltage overhead line.

CONCLUSION

Based upon the above reasoning, Third-Party Plaintiff PacifiCorp's Motion for Partial Summary Judgment is GRANTED.


Summaries of

Snyder v. Pacificorp

United States District Court, D. Utah, Central Division
Oct 24, 2005
Case No. 2:03CV811DAK (D. Utah Oct. 24, 2005)
Case details for

Snyder v. Pacificorp

Case Details

Full title:FRANK SNYDER and VICKIE SNYDER, Plaintiff, v. PACIFICORP, Defendant…

Court:United States District Court, D. Utah, Central Division

Date published: Oct 24, 2005

Citations

Case No. 2:03CV811DAK (D. Utah Oct. 24, 2005)