Opinion
Index No. 157618/2019 Motion Seq. No. 004
03-14-2024
Unpublished Opinion
MOTION DATE 03/10/2023
DECISION+ ORDER ON MOTION
HON. DAVID B. COHEN, Justice
The following e-filed documents, listed by NYSCEF document number (Motion 004) 65, 66, 67, 68, 69, 70, 71,72, 73, 74, 75, 76, 77, 78, 79, 80, 81,82, 83, 84, 85, 86, 87, 88, 89 were read on this motion to/for SUMMARY JUDGMENT (AFTER JOINDER)
In this personal injury action, plaintiff moves, pursuant to CPLR 3212, for an order granting summary judgment against defendants as to the issue of liability.
I. BACKGROUND
Plaintiff commenced this action by filing a summons and verified complaint on August 5, 2019, alleging that she sustained personal injuries when a construction fence fell on her (NYSCEF DOC. NO. 1). Plaintiff contends that "[o]n July 25, 2018, at approximately 6:05 a.m., [she] was walking to work at 1 Police Plaza, New York as a New York City Police Officer, when a barrier/chain link fence surrounding a construction site suddenly, and without warning, fell on top of [her] at premises known as 375 Pearl Street, New York, New York. It knocked [her] to the ground causing a wrist and various other injuries" (NYSCEF DOC. NO. 69).
Defendants joined issue by service of their answer on October 25, 2019 (NYSCEF DOC. NO. 3).
In response to a Notice to Admit served by plaintiff, defendants admitted that defendant F&S Contracting Group, Inc. (F&S) installed the fence at issue (NYSCEF DOC. NO. 23).
On August 20, 2020, plaintiff filed a summary judgment motion, which was denied on February 3, 2021 "without prejudice to renew at the completion of discovery." (NYSCEF DOC. NO. 44 at pg. 6).
Two F&S employees were deposed and testified, as pertinent here, that the fence at issue was a plastic Yodock fence, described as "orange and white with a four foot fence on top that's fastened through the barrier and there was mesh on the fence," with the barriers secured to the ground by filling them with water. The fence itself was a typical chain link fence, approximately four feet long (NYSCEF DOC. NO. 75).
F&S built and installed the fence, which included a metal post inserted into each barrier. When shown a video of the incident, F&S's chief engineer testified that it looked like high winds caused the fence to fall over, which was not supposed to happen. He also testified that the fence was properly erected, and that the potential for wind velocity is taken into account when building fences (NYSCEF DOC. NO. 76).
According to plaintiffs expert, in his professional opinion, "the barrier/fence in question was not properly installed, shored, constructed or maintained. The only explanation, based on my years of education, training and experience, is that the Defendants were responsible for the erection of this barrier/fence, as well as responsible for this accident, and the barrier/fence would not have fallen had its installation been done properly." In particular, the expert opines that the construction and installation of the fence did not take into the account the potential for high wind gusts (NYSCEF DOC. NO. 77).
Defendant's expert, a certified meteorologist, states that the relevant weather data records show that a cluster of showers and thunderstorms began to move toward the accident location on the morning of the accident, and that in his opinion, "based upon a reasonable degree of meteorological certainty," wind gusts of 55 to 60 mph were present in the subject location at the time of the accident, and the gusts "were not forecasted or foreseeable." (NYSCEF DOC. NO. 84).
II. ANALYSIS
"The proponent of a summary judgment motion must make a prima facie showing of entitlement to judgment as a matter of law, tendering sufficient evidence to eliminate any material issues of fact." (Alvarez v Prospect Hosp., 68 N.Y.2d 320, 324 [1986] citing Winegrad v New York Univ. Med. Ctr., 64 N.Y.2d 851, 853 [1985]). Once the movant has made a prima facie showing, the burden shifts to the opposing party to "present evidentiary facts in admissible form sufficient to raise a genuine, triable issue of fact." (Casper v Cushman &Waktfield, 14 A.D.3d 669, 669 [1st Dept 2010], Iv dismissed 16 N.Y.3d 766 [2011] [internal quotation marks and citation omitted]).
Plaintiff contends that defendants may be held liable pursuant to res ipsa loquitur, on the ground that the fence was in their exclusive control and it would not have fallen on her in the absence of their negligence. Defendants raise several arguments in opposition, including that res ipsa loquitur does not apply as the accident occurred on a very windy day, thereby creating an issue of fact as to whether the fence was properly installed and secured.
An accident subject to a res ipsa loquitur claim "(1) must be of a kind which ordinarily does not occur in the absence of someone's negligence; (2) it must be caused by an agency or instrumentality within the exclusive control of the defendant; [and] (3) it must not have been due to any voluntary action or contribution on the part of the plaintiff." (Monjon v Rais Constr. Co., 7 N.Y.3d 203, 209 [2006][internal quotation marks and citation omitted]). "It is the rare case in which a plaintiff will be entitled to... [summary judgment] because the prima facie proof is so convincing that the inference [of negligence] arising therefrom is inescapable if not rebutted by other evidence.'" (Tora v GVP AG, 31 A.D.3d 341, 342 [1st Dept 2006], quoting Shinshine Corp. v Kinney Sys., 173 A.D.2d 293, 294 [1st Dept 1991]). The granting of summary judgment based on the doctrine of res ipsa loquitur is appropriate solely in "exceptional case[s]" and not where there are issues of fact with respect to defendants' liability (Monjon, 7 N.Y.3d at 212; see also Jainsinghani v One Vanderbilt Owner, LLC, 162 A.D.3d 603, 604 [1st Dept 2018]).
Here, even assuming that plaintiff established all of the elements of a res ipsa loquitur claim, defendants raise a triable issue through evidence that there were unexpectedly high winds at the time of the accident. In Tora, the plaintiff was injured when a piece of a sidewalk shed toppled over as a result of strong winds. The Appellate Division, First Department, reversed the trial court's grant of summary judgment on liability to plaintiff, finding that the "[defendants' contention that unusually strong gusts of wind caused the shed to lift and injure plaintiff is sufficient to negate, at least for purposes of summary judgment, the first element of res ipsa" namely "that the event was of a kind which ordinarily does not occur in the absence of negligence." (31 A.D.3d at 343; see also Bunn v City cf New York, 180 A.D.3d 550 [1st Dept 2020] [res ipsa loquitur inapplicable to accident where sign dislodged from metal post and fell on plaintiff, as alleged defect could have been caused by number of factors, including "wind/weather conditions"]; Zecevic v LAN Cargo S.A., 137 A.D.3d 465 [1st Dept 2016] [trial court properly denied summary judgment to plaintiff as factual issue existed as to whether unusually strong wind caused crate to fall on plaintiff]; Ryan v Trustees cf Columbia Univ, in City of New York, Inc., 96 A.D.3d 551 [1st Dept 2012] [summary judgment properly denied as sidewalk bridge collapsed in windy conditions]; Dos Santos v Power Auth. of State of N. Y., 85 A.D.3d 718 [2d Dept 2011] [plaintiff did not establish res ipsa as door collapse may have been caused by strong wind], Iv denied 20 N.Y.3d 856 [2013]; Lofstad v S&R Fisheries, Inc., 45 A.D.3d 739 [2d Dept 2007] [triable issue existed as to whether shed blown off roof by 70-mile-per-hour winds]).
The parties' remaining contentions are either without merit or need not be addressed given the above result.
III. CONCLUSION
Accordingly, it is hereby
ORDERED that plaintiffs motion for summary judgment on liability is denied; and it is further
ORDERED, that the parties appear for a settlement/trial scheduling conference before this Court on May 29, 2024, at 10:30 a.m., 71 Thomas Street, Room 305, New York, New York.