Opinion
11-03-2016
Shawn Law Offices, Monticello (Jeffrey L. Nash of Nash Law Group, LLC, Camden, New Jersey, of counsel), for appellants. The Wolford Law Firm, LLP, Rochester (James S. Wolford of counsel), for respondent.
Shawn Law Offices, Monticello (Jeffrey L. Nash of Nash Law Group, LLC, Camden, New Jersey, of counsel), for appellants.
The Wolford Law Firm, LLP, Rochester (James S. Wolford of counsel), for respondent.
Before: PETERS, P.J., McCARTHY, LYNCH, ROSE and CLARK, JJ.
CLARK, J.
(1) Appeal from an order of the Supreme Court (Meddaugh, J.), entered April 10, 2015 in Sullivan County, which granted defendant's motion for summary judgment dismissing the complaint, and (2) motion to dismiss appeal.
Plaintiffs owned a house situated on several acres of land in the Town of Thompson, Sullivan County. On August 28, 2011, as a result of Hurricane Irene, a tree branch fell onto and severed a power line owned and maintained by defendant on its permanent utility easement over a wooded portion of plaintiffs' property, hundreds of feet from plaintiffs' house. In response, defendant dispatched a line guard to prevent any person from coming into contact with the live wire until the line could be repaired. The downed power line, which remained live for several hours, made contact with an above-ground PVC pipe containing water and electrical lines for a sprinkler system. The downed power line burned through the PVC pipe and electrical insulation and energized the sprinkler system's electrical wire, which connected to an electrical box in plaintiffs' residence, thereby causing electrical arcing and a structural fire in plaintiffs' house.
Plaintiffs commenced this action alleging, among other things, that defendant was negligent in maintaining, inspecting and repairing the power line and that it failed to take the proper precautions to prevent the electrical malfunctions that caused the fire. Following joinder of issue and disclosure, defendant moved for summary judgment dismissing the complaint. Supreme Court granted the motion in its entirety. Plaintiffs appealed, and defendant thereafter moved to dismiss the appeal on the basis that, in the absence of a valid notice of appeal, this Court lacked jurisdiction. This Court withheld decision and directed that the motion be decided in conjunction with the appeal.
Plaintiffs conceded to the dismissal of their remaining causes of action sounding in breach of implied and express warranties, strict liability and breach of contract.
Initially, we deny defendant's motion to dismiss the appeal. While plaintiffs' attorney of record filed a notice withdrawing plaintiffs' timely notice of appeal, he later filed an amended notice clarifying that the prior notice was intended to withdraw only that portion of the appeal relating to the subrogation claims belonging to plaintiffs' insurer (see CPLR 1004 ), not that portion of the appeal relating to plaintiffs' claims to recover for uninsured property damages. In the absence of any demonstrated prejudice to defendant, who apparently had notice of plaintiffs' intention to proceed with an appeal, and considering that counsel promptly corrected the mistake upon learning of its occurrence, we overlook any resulting defects in plaintiffs' notice of appeal in the exercise of our discretion (see Matter of Deraway v. Bulk Stor., Inc., 51 A.D.3d 1313, 1314 n. 1, 858 N.Y.S.2d 459 [2008] ; Salvador v. Town Bd. of Town of Queensbury, 303 A.D.2d 826, 827, 757 N.Y.S.2d 118 [2003] ).
Turning to the merits, “[t]o establish a prima facie case of negligence, the plaintiff is required to demonstrate that the defendant owed a duty to him or her, that the defendant breached that duty and that such breach was a proximate cause of the injuries sustained” (Evarts v. Pyro Eng'g, Inc., 117 A.D.3d 1148, 1150, 985 N.Y.S.2d 179 [2014] ; see Pasternack v. Laboratory Corp. of Am. Holdings, 27 N.Y.3d 817, 825, 37 N.Y.S.3d 750, 59 N.E.3d 485 [2016] ). Although dependent upon the facts and circumstances, “ [t]he existence and scope of an alleged tortfeasor's duty is, in the first instance, a legal question for determination by the court” (Di Ponzio v. Riordan, 89 N.Y.2d 578, 583, 657 N.Y.S.2d 377, 679 N.E.2d 616 [1997] ; see Tagle v. Jakob, 97 N.Y.2d 165, 168, 737 N.Y.S.2d 331, 763 N.E.2d 107 [2001] ; Sciscente
v. Lill Overhead Doors, Inc., 78 A.D.3d 1300, 1301, 910 N.Y.S.2d 248 [2010] ). In determining the scope of duty, courts examine, among other factors, whether the “injury-producing occurrence is one that could have been anticipated” (Di Ponzio v. Riordan, 89 N.Y.2d at 583, 657 N.Y.S.2d 377, 679 N.E.2d 616 ; see Gordon v. City of New York, 70 N.Y.2d 839, 841, 523 N.Y.S.2d 445, 517 N.E.2d 1331 [1987] ; Moore v. J.A. Bradley & Sons, Inc., 68 A.D.3d 1419, 1422, 892 N.Y.S.2d 564 [2009] ).
Defendant's submissions in support of its motion for summary judgment established that it did not consent to, or receive notice of, the installation of the sprinkler system over 10 years prior to the fire. The terms of defendant's easement prohibited the construction of surface or subsurface structures on the easement without defendant's prior written consent. Defendant's employee averred that defendant's records contained no indication that defendant had been notified of the installation or consented to it. Additionally, plaintiff Henry Montanez and his father-in-law, who apparently paid for the installation of the sprinkler system, stated in their deposition testimony that they did not notify defendant that water and electrical lines had been installed above ground on the easement. In fact, Montanez, his father-in-law and the property's groundskeeper all asserted that they were unaware that the PVC piping on the easement was above ground, and several witnesses involved in investigating the cause of the fire asserted that the piping was covered by heavy brush and vegetation.
Defendant's expert explained that the PVC pipe containing electrical and water lines was installed above ground in violation of electrical code and opined that, had the pipe been buried underground in compliance with code, the fire would not have occurred. He thus opined that the cause of the fire was the negligent installation of the sprinkler system and that a structural fire roughly 275 feet from a downed power line is not a normal and foreseeable consequence of that downed line. As Supreme Court properly concluded, the foregoing proof established defendant's prima facie entitlement to judgment as a matter of law on the basis that, under the circumstances caused by the hurricane, defendant acted reasonably in dispatching a line guard to prevent anyone from coming into contact with the downed line and that it could not have anticipated that the power line would come into contact with electrical wiring that was improperly installed above ground by a third party—in violation of electrical code—on its easement in a heavily wooded area without having received notice of, or given consent for, its installation and that such contact would cause the electrical arcing that started a fire in the residence (see Moore v. J.A. Bradley & Sons, Inc., 68 A.D.3d at 1421, 892 N.Y.S.2d 564 ; Amica Mut. Ins. Co. v. Town of Vestal, 191 A.D.2d 916, 917, 594 N.Y.S.2d 918 [1993] ). The burden thus shifted to plaintiffs to put forth competent proof demonstrating the existence of triable issues of fact precluding summary judgment dismissing the complaint (see Sherman v. New York State Thruway Auth., 27 N.Y.3d 1019, 1022, 32 N.Y.S.3d 568, 52 N.E.3d 231 [2016] ).
Plaintiffs are largely in agreement with defendant as to the salient facts and circumstances underlying the fire, but disagree as to the duty that arose to defendant under these circumstances. Plaintiffs argue that defendant should have been aware of the PVC piping on the easement, which plaintiffs' expert described as “clearly open and apparently visible,” because it had repaired the power line at issue on several prior occasions. However, plaintiffs failed to establish how the mere observance of PVC piping on the easement would enable defendant to conclude that the piping contained an electrical wire that connected to an electrical box in the house and, thus, anticipate that the downed power line could cause a structural fire at the house. The affidavits of plaintiffs' experts, who opined that defendant was negligent in responding to the dangerous condition posed by the downed power line and that the risk of fire was reasonably foreseeable, failed to address this deficiency. As plaintiffs' evidence, including the conclusory opinions offered by their experts, fell short of demonstrating that defendant should have reasonably perceived the risk that the downed power line could cause a fire in the residence hundreds of feet away, Supreme Court properly granted defendant's motion for summary judgment dismissing the complaint (see Moore v. J.A. Bradley & Sons, Inc., 68 A.D.3d at 1422, 892 N.Y.S.2d 564 ; Lee v. New York City Hous. Auth., 25 A.D.3d 214, 218–219, 803 N.Y.S.2d 538 [2005], lv. denied 6 N.Y.3d 708, 812 N.Y.S.2d 443, 845 N.E.2d 1274 [2006] ).
ORDERED that the motion to dismiss the appeal is denied, without costs.
ORDERED that the order is affirmed, with costs.