Opinion
No. 41524.
September 11, 1950. Motion for Rehearing or to Transfer to Banc Overruled, October 9, 1950.
Action by a city and landowners outside a drainage district to enjoin the construction of a higher levee alongside the original levee. The district had such right under the Drainage Act. A 1944 decree was not res judicata in view of changed conditions. The district had the right to protect its lands from flood waters even though such waters be turned on the lands of others.
1. LEVEES AND FLOOD CONTROL: Higher Levee of Drainage District: Authority to Construct. Under the Drainage Act defendant drainage district had the right to construct a higher levee alongside its old levee, the top of which was used as a highway, when the old levee proved insufficient to protect the lands in the district from the flood waters of Crooked Creek and the Missouri River.
2. LEVEES AND FLOOD CONTROL: Judgments: Prior Judgment Not Res Judicata. A 1944 judgment denying the district the right to construct new levees was not res judicata in view of floods and other changed conditions since the rendition of the judgment.
3. LEVEES AND FLOOD CONTROL: Injunctions: Right to Protect Against Flood Waters: Plaintiffs Not Entitled to Injunctive Relief. Defendant district had the right to protect its lands from flood waters even though such waters be turned upon the lands of others outside the district. Plaintiffs were not entitled to injunctive relief.
Appeal from Ray Circuit Court; Hon. James S. Rooney, Judge.
AFFIRMED.
Harry A. Hall and Wilson D. Hill for appellants.
(1) The court erred in holding that the defendant could change its plan for reclamation without following the statutory procedure. The Drainage Act is a code unto itself. In re Mississippi Fox Drainage Dist., 192 S.W. 727, 270 Mo. 157; Graves v. Little Tarkio Drainage Dist., 134 S.W.2d 70, 345 Mo. 557; State ex inf. McAllister v. Norborne Drainage Dist., 234 S.W. 344, 290 Mo. 131. (2) The act provides the method for changing the district's levees. State ex rel. v. Hill, 253 S.W. 448, 212 Mo. App. 173; State ex rel. Norborne Dist. v. Hughes, 294 Mo. 1, 240 S.W. 802; Peatman v. Worthington Drainage Dist., 176 S.W.2d 539, 238 Mo. App. 64; Chilton v. Drainage Dist. No. 8, 63 S.W.2d 421, 228 Mo. App. 4; State ex rel. v. Trimble, 308 Mo. 123, 272 S.W. 66; Grand River Drainage Dist. v. Reid, 111 S.W.2d 15, 341 Mo. 1246; Sec. 12367, R.S. 1939. (3) The court erred in holding that the denial of the petition of the district to change its plan for reclamation by the Circuit Court of Carroll County was not res adjudicata of its right to construct the present levee. Pearson Drainage Dist. v. Erhardt, 201 S.W.2d 484, 239 Mo. App. 845. (4) The court erred in holding that the defendant could obstruct the natural drainage and damage plaintiffs' property. Bruntmeyer v. Squaw Creek Drainage Dist., 196 Mo. App. 360, 194 S.W. 748; Greenwell v. Wills, 239 S.W. 578, 210 Mo. App. 651; Labaddie Bottoms Dist. v. Chicago, R.I. P.R., 42 S.W.2d 954, 226 Mo. App. 121; Farrar v. Shuss, 282 S.W. 512, 221 Mo. App. 472; Keener v. Sharp, 111 S.W.2d 118, 341 Mo. 1192. (5) The court erred in refusing to enjoin the construction and maintenance of the proposed levee by the defendant. Rosenberger v. Miller, 61 Mo. App. 422; School Dist. No. 3 v. Young, 152 Mo. App. 304, 133 S.W. 143; St. Louis Smelting Refining Co. v. Hoban, 209 S.W.2d 119; State ex rel. Walker v. Big Medicine Drainage Dist., 196 S.W.2d 254, 355 Mo. 412.
W.A. Franken, John Franken, Francis G. Hale and Robert E. Coleberd for respondents.
(1) The Norborne Land Drainage District Company had the right to reconstruct the Missouri River Levee. Graves v. Little Tarkio Drainage Dist. No. 1, 345 Mo. 557, 134 S.W.2d 70; Keener v. Sharp, 341 Mo. 1192, 111 S.W.2d 118; Anderson v. Drainage Levee District, 309 Mo. 189, 274 S.W. 448; Sec. 12349 R.S. 1939. (2) The raising of this levee and rebuilding it on the side of the road is not a change in plan, but a means of affording the protection to the lands in the district intended by the plan for reclamation. This is merely maintaining and protecting the plan for reclamation. Graves v. Little Tarkio Drainage Dis. No. 1, 345 Mo. 557, 134 S.W.2d 70; Secs. 12339, 12349, 12370, R.S. 1939. (3) The denial by the Circuit Court of Carroll County, Missouri, of the petition of the Norborne Land Drainage District for change of plan was not res adjudicata of the right to reconstruct the present levee, except in favor of the right of the district to build it because the district had already acquired by condemnation the land upon which to build the levee, under proceedings which were entirely different, and in such case there is no res adjudicata. State v. Maughmer, 214 S.W.2d 754; Norwood v. Norwood, 355 Mo. 548, 183 S.W.2d 118. (4) Even though the form of proceedings had been a condemnation suit, it would not have been barred by the proceeding to acquire the right of way by condemnation. City of Moberly v. Hogan, 317 Mo. 1225; 20 C.J. 640; 29 C.J.S. 891; C., B. Q. Railroad Co. v. North Kansas City Development Co., 134 F.2d 122. (5) The proceeding to rebuild the levee is not a change in plan but merely the maintenance and protection of the plan for reclamation adopted in 1923. Graves v. Little Tarkio Drainage Dist. No. 1, 345 Mo. 557, 134 S.W.2d 70. (6) The raising of the Missouri River Levee which was originally constructed in 1923, does not interfere with any natural water course. There is no substantial evidence to the contrary. Keener v. Sharp, 341 Mo. 1192, 111 S.W.2d 118. (7) The action of the court in denying the plaintiffs an injunction was correct because the plaintiffs, being outside the district, had no legal interest in the building of the levee. Keener v. Sharp, 341 Mo. 1192, 111 S.W.2d 118; Anderson v. Drainage Levee District, 309 Mo. 189, 274 S.W. 448. (8) The levee being reconstructed does not interfere with any natural water course. Keener v. Sharp, 341 Mo. 1192, 111 S.W.2d 118; Denison v. Chicago Alton Railroad Co., 78 Mo. 504; Adair Drainage Dist. v. O.K. Railroad Co., 280 Mo. 244, 17 S.W. 70.
The plaintiff city of Hardin and a large number of landowners appeal from a judgment of the Ray county circuit court denying their petition to enjoin the defendant-respondent Norborne Land Drainage District of Carroll county, its supervisors and contractor, from constructing and maintaining what we shall call for convenience a "new levee of greater height alongside an existing levee in the district. Respondents say it is merely an extension of the original levee. Appellants assert the new levee would block the natural drainage of overflow water and cause it to inundate their publicly and privately owned realty, none of which is in the district, to a depth of five feet, and would damage the same in excess of $1,000,000, without just compensation, in violation of Sec's 10 and 26, Const. Mo. 1945.
Appellants further contend: (1) that Art. 1, Chap. 79, R.S. 1939, Mo. R.S.A., Sec's 12324-12389 A, under which respondent district was reorganized in 1917, require the new levee to be sanctioned by its plan for reclamation; (2) that it is neither sanctioned nor contemplated by that plan; (3) that in 1944 in a proceeding in the Carroll county circuit court the district sought to have its plan for reclamation amended so as to permit the construction of the new levee, and such permission was refused, thereby making the matter res judicata; (4) that the district has no right to dam and collect the flood waters from the Missouri and Crooked rivers by means of the levee, and force them in destructive quantities on appellants' lands; (5) and that injunction is the proper remedy to prevent it.
The respondent district and co-appellants maintain: (1) that they have the right to construct the new levee under the statutes above cited; (2) that the new levee is merely a lateral extension of the existing levee and will be built to protect the land in the district in furtherance of [923] the intent and purpose of the existing plan for reclamation; (3) that the denial by the Carroll county court in 1944 of the respondent district's petition for a change in the plan for reclamation was not res judicata of its right to construct the new levee as a part of the old; (4) that the district has already acquired by condemnation the land upon which the new levee is to be built, that condemnation proceeding being entirely different from the Carroll county drainage district proceedings, in consequence of which there was no adjudication common to both, and no res judicata between the two; (5) that the raising of the elevation of the levee system will not interfere with any natural watercourse; (6) and that the denial of the injunction was proper because appellants' lands are outside district and they therefore have no legal interest in the building of the levee.
The facts, stated as briefly as possible, are that the respondent drainage district contains 40,000 acres in the southeast part of Ray county and the southwest part of Carroll county. In 1924 it built, and has since maintained, a levee in accordance with its plan for reclamation, as approved by the circuit court of Carroll county. That levee runs south and east of the city of Hardin, and its elevation is about 2-½ feet below that of the city. Hence it did not cause overflow there under the conditions existing in former years. The top of the levee is graveled and used as a public road for about 1-¼ miles. The new levee involved here parallels and abuts the existing levee. It is admitted that its elevation will be about 5-½ feet above that of the old levee. One of appellants' witnesses said it would be 9 feet higher. And it is concededly higher than is provided in the district's plan for reclamation. This additional height could not be superimposed on the existing levee without destroying the graveled road therealong. As shown by appellants' photographs, Exhibits 7, 8 and 9, a part of the new levee had been built before this case was tried.
The sources of the flood water are Crooked river and the Missouri river. The former comes from the northwest and loops around the south side of the city of Hardin, within ½ mile thereof at the nearest point. Thence it swings in a southerly direction and discharges into the Missouri river about four miles south of Hardin. There is a rather extensive flood area of low farm land southeast of the city. Three other levee or drainage districts have coverage and levees there. These exclude flood water from the protected parts, but reduce the area of the unprotected part and raise its flood water level. It appears also that a navigation levee has been built along the Missouri river, having the same effect. In the 1943 flood the respondent district and 800 soldiers placed sandbags on the Missouri river levee. In 1946 one of the other levee districts raised its levee, and the next year high water overflowed the respondent district's original levee and submerged 20,000 acres of farm land therein.
The respondent district thereupon, that same year, filed a condemnation suit in the circuit court of Ray county to appropriate strips of land for the new levee. The old levee abuts the boundary line of the district and the new levee is built against the old one. In other words, both levees border on but are just outside the district boundary. This condemnation suit was resisted by two of the servient landowners, who applied to this court for a writ of prohibition, which was denied without opinion.
The district then proceeded with its condemnation suit, paid the damages assessed, took possession of the condemned strips, and resumed construction of the new levee. They were ejected from the land by the landowners, and the district then brought a suit in the circuit court of Ray county to enjoin the landowners from obstructing the construction of the new levee. That court issued its restraining order and the landowners brought prohibition in the Kansas City Court of Appeals. After a hearing on the merits that court quashed its preliminary writ and denied relief. State ex rel. Stratton et al. v. Maughmer, Judge, et al., 214 S.W.2d 754. Accordingly, the drainage district resumed construction of the new levee, but the city of Hardin and associated landowners [924] brought the instant suit against the district, its supervisors and contractor, in November, 1948 to enjoin the construction of the levee.
Appellants' basic contentions are that the construction of the new levee is not authorized or contemplated by the respondent district's old 1924 plan for reclamation; that the circuit court drainage act, cited at the beginning of this opinion, specifies the only method of changing the district levee scheme; that the district has not followed that procedure, but is attempting to construct the new levee under the old plan for reclamation: in consequence its action is and will be ultra vires.
In so contending appellants quote the statement found in many decisions of our appellate courts, that the Drainage Act cited at the beginning of this opinion is "a code within itself" — a fact which no one disputes. They also cite Sec. 12349 thereof, which enumerates the broad powers of the board of supervisors, but says nothing about a change in plan; and Sec. 12367, which specifies the procedure by which the board may petition for a decree of the circuit court authorizing a change in plan for reclamation, after a hearing of which public notice must be given, and at which the landowners may appear and object. No such proceeding was had here.
But these are not the only sections of the Act applicable to the present controversy. Respondents cite Sec. 12339 which provides that the board of supervisors "shall have full power and authority to build, construct, excavate and complete all or any works and improvements which may be needed to carry out, maintain and protect `the plan for reclamation.'" Likewise, Sec. 12349 [also cited by appellants, supra] authorizes the board to "concentrate, divert or divide the flow of water in or out of (the) district," and to construct and maintain main and lateral levees; and to condemn for the use of the district land or property within or without the district.
Still further, Sec. 12350 provides that after the plan for reclamation has been filed in the office of the circuit clerk, and work has progressed thereunder, if it be found that some of the ditches or other improvements called for by the plan are inadequate, and do not afford substantially equal protection to all the land in the district equally taxed, the board on recommendation of the chief engineer may enlarge the inadequate ditches, construct such additional levees as are necessary; and file a description of the added improvements with the secretary of the board and a certified copy with the circuit clerk, whereupon it shall become a part of the plan for reclamation. The section does not require any court action. But the cost of the added works is paid out of benefit assessments.
Sec. 12370 provides that "To maintain and preserve the ditches, drains, levees or other improvements made pursuant to this article and to strengthen, repair and restore the same, when needed" — (italics ours) — the district may levy maintenance taxes. And Sec. 12374 provides that when the works set out in the plan for reclamation are found insufficient to reclaim in whole or in part any or all of the land in the district, the board of supervisors may formulate new or amended plans containing new levees or for the enlargement of existing levees, and additional benefit assessments may be made under Sec. 12336, which covers the initial benefit assessments when the district is incorporated.
And finally, Sec. 12389, the last section of the article, provides in part: "This article is hereby declared to be remedial in character and purpose, and shall be liberally construed by the courts in carrying out this legislative intent and purpose."
These statutes were considered and applied in Graves v. Little Tarkio Drainage Dist., 345 Mo. 557, 568-70 (4-6), 134 S.W.2d 70, 78-9 (8-14). As will be seen on a reading of that decision, the improvements made there were far more comprehensive than that proposed here. The decision says: "The condition of (that) district presented a serious situation. The plan of reclamation was not functioning. The levees were broken in many places; some ditches were filled in until hardly recognizable as a depression. The increased (external) floods from above were rapidly destroying the works of the district. The new board was [925] faced with the duty of protecting and preserving the investments of the district." (Parentheses ours)
Continuing the opinion held the reconstruction of the ditches and laterals in that case was within the powers granted to the board of supervisors by Sec. 12370, supra, to maintain and protect the existing plan for reclamation; and was not referable to Sec. 12350, supra, which authorizes an amendment of the original plan for reclamation without court action, or to Sec. 12374, supra, which authorizes the board to formulate new or amended plans for reclamation. Under the first named Sec. 12370, the cost of the work is defrayed by a maintenance tax, whereas under Sec's 12350 and 12374 it is paid from benefit assessments.
We think the Graves case, supra, is controlling authority here. Appellants do not attempt to distinguish it, because they assume the construction of the "new" levee, as we have called it in this opinion, is new construction and not maintenance and preservation of the old levee. We do not agree. It does not change the original plan for reclamation with respect to any inherent defects therein, as contemplated by Sec's 12350 and 12374, supra. Neither does it attempt to provide new benefits. It simply seeks to continue the protection theretofore furnished by the original levee until subsequent external conditions rendered it insufficient in height and strength. Neither is the physical reconstruction of the original levee new construction in any fair sense. The additional dirt could not be deposited on top of it without destroying the graveled road thereon. And undoubtedly its height could not be increased without widening its base. So the so-called higher new levee was simply placed alongside the original levee as a part thereof. We rule this assignment against appellants.
Appellants' next assignment is that the denial by the Carroll county circuit court in 1944 of the district's petition to change its plan for reclamation so as to permit the building of the new levee was res judicata on the proposition that it has no right to do so now. We have already held no change in plan was necessary thereto. But following appellants' contention further. They cite Pearson Drain. Dist. v. Erhardt, 239 Mo. App. 845, 855(11,12), 201 S.W.2d 484, 489(8). In that case the plaintiff district had sued the defendant for drainage taxes, and the court sustained the defense that it had no legal capacity to sue because its incorporation had been held void in a prior decision, which operated as an estoppel under the doctrine of res judicata.
We think the cited decision is not in point because the prior disability there was permanent. But here the evidence shows that in 1947 — three years after the Carroll county circuit court had refused to change the plan for reclamation — flood waters from the Crooked and the Missouri rivers overflowed the respondent district's levee and submerged 20,000 acres, one-half of the land therein, and even covered part of a cemetery in or adjacent to Hardin. In these changed circumstances the refusal of the Carroll county circuit court three years earlier to change the plan for reclamation could hardly be res judicata. And there is also a statement in respondents' brief that the ruling of that court in 1944 was induced by the testimony of objectors that another levee district (No. 4) contemplated raising its levee, whereby all the land in the territory would be protected — which was not done, as proven by the fact that that district's levee was washed out in 1947.
The general rule is: "The estoppel of a judgment extends only to the facts in issue as they existed at the time the judgment was rendered, and does not prevent a reëxamination of the same questions between the same parties where in the interval the facts have changed or new facts have occurred which may alter the legal rights or relations of the litigants. * *" 50 C.J.S., § 712b, p. 180. See also 34 C.J., § 1228(4), p. 808.
The statement in 30 Am. Jur., § 206, p. 943, is: "The mere change of facts subsequent to the rendition of a judgment does not necessarily affect the operation of such judgment under the doctrine of res judicata. [926] * * However, where, after the rendition of a judgment, subsequent events occur, creating a new legal situation or altering the legal rights or relations of the litigants, the judgment may thereby be precluded from operating as an estoppel. In such case, the earlier adjudication is not permitted to bar a new action to vindicate rights subsequently acquired. In this connection, it has been declared that a judgment is not res judicata as to rights which were not in existence at the time of the rendition of the judgment. * *"
Appellants' next and final assignment on the merits is that the trial court erred in holding the respondent could obstruct the "natural drainage" and thereby damage their realty. They cite five decisions, to which we have added four other authorities. The Bruntmeyer case was a suit for damages to plaintiff's crops on land outside the defendant district, caused by the discharge of water collected by its system of dikes, ditches and drains. The opinion says this water came from water courses and surface water which was discharged in volume on plaintiff's land. At the conclusion it states that if the district could thus collect "its surface water into one volume" and divert natural watercourses, and thus damage plaintiff without compensation, it would violate what is now Sec. 26, Art. 1, Const. 1945. The decision was limited to land outside the district, by the Greenwell case,fn1 and by the Hausgen case,fn1 as to torts.
Bruntmeyer v. Squaw Creek Dr. Dist., 196 Mo. App. 360, 367(1), 194 S.W. 748, 751(4); Greenwell v. Wills et al., 210 Mo. App. 651, 654-5(2), 239 S.W. 578, 583(2); Farrar v. Shuss, 221 Mo. App. 472, 476(1), 282 S.W. 512, 514(1); Labaddie Bottoms Dr. Dist. v. C.R.I. P. Ry. Co., 226 Mo. App. 121, 126(1), 42 S.W.2d 954, 956(1); State ex rel. Hausgen v. Allen, 298 Mo. 448, 459(2), 250 S.W. 905, 907(3); Anderson v. Inter-River Dr.-Lv. Dist., 309 Mo. 189, 205-16(1, 3, 4, 5), 274 S.W. 448, 453; Sigler v. Inter-River Drain. Dist., 311 Mo. 175, 195-208(1-4), 279 S.W. 50, 55-9(1-4), Annotation, 5 A.L.R.2d 60; Keener v. Sharp, 341 Mo. 1192, 1195(1), 111 S.W.2d 118, 120(3).
This left our law holding that owners of land outside the district could recover damages for overflow caused by drainage works regardless of whether the water came from natural watercourses, or was mere surface water, and notwithstanding Sec. 12349 of the instant drainage act provides a drainage district may "concentrate, divert or divide the flow of water in or out of said district." But a fundamental distinction was made later by the Anderson casefn1 and followed in the Sigler case. It was this. As shown in 40 Words Phrases (Perm. Ed.) p. 842, "Surface Water," there are fifteen Missouri decisions holding that overflow out of banks from rivers or other watercourses in times of flood is "surface water", as well as that produced by heavy rains or snows, etc. And we have always followed the common law doctrine that surface water is a common enemy, and that each land proprietor may ward it off though by so doing he turns it on his neighbor.
And so the Anderson case held that a drainage district is a governmental agency exercising the police power; and that as such it may fend off surface waters as a common enemy — in the protection of its own landowners, though the water be turned on the land of others outside the district. There is no evidence here that waters other than flood waters have been turned on the appellants, and the judgment of the trial court should be and is affirmed. All concur.