On December 11, 2012, Plaintiff Benchmark Young Adult School, Inc. dba Benchmark Transitions ("Plaintiff") commenced this action against Defendants Launchworks Life Services, LLC dba Mark Houston Recovery Center and Benchmark Recovery Center for federal trademark infringement, false designation of origin, unlawful trade name use, California common law trademark infringement, and unfair competition and unfair business practices. Plaintiff now moves for leave to file a first supplemental and amended complaint. (ECF No. 34.) Defendant Launchworks Life Services, LLC dba Benchmark Recovery Center fka Mark Houston Recovery Center ("Defendant") opposes. (ECF No. 41.)
The Court decides the matter on the papers submitted and without oral argument. See Civ. L.R. 7.1(d)(1). For the following reasons, the Court GRANTS IN PART and DENIES IN PART Plaintiff's motion for leave to file a supplemental and amended complaint.
I. BACKGROUND
On December 11, 2012, Plaintiff commenced this action, asserting claims for federal trademark infringement, false designation of origin, unlawful trade name use, California common law trademark infringement, and unfair competition and unfair business practices. (ECF No. 1 ("Complaint").) On February 1, 2013, Defendant filed an Answer. (ECF No. 6.) Pursuant to a stipulation between the parties and Court order thereon, on July 3, 2013, Defendant filed an amended Answer and Counterclaim seeking a declaration of non-infringement and a declaration of unenforceability and/or invalidity. (ECF Nos. 23-26.)
On June 5, 2013, Magistrate Judge Skomal issued the Case Management Conference Order Regulating Discovery and Other Pretrial Proceedings ("Scheduling Order") in this matter which provided that the deadline to file any motion to amend the pleadings was June 29, 2013. (ECF No. 22.) On September 24, 2013, the parties jointly moved to continue several dates in the Scheduling Order, including the fact and expert discovery deadlines, because "due to technological snafus in the gathering and processing of electronically stored information, neither Party ha[d] produced responsive documents." (ECF No. 27.) In their joint motion, the parties did not request an extension of time to file a motion to amend the pleadings. (See id.) On October 1, 2013, Magistrate Judge Skomal granted the joint motion, in part, which, among other things, extended the fact discovery deadline to November 29, 2013 and the expert discovery deadline to March 28, 2014. (ECF No. 28 ("Amended Scheduling Order".)
On January 22, 2014, Plaintiff filed the present motion. (ECF No. 34 at p. 2.) Plaintiff initially sought leave to file a supplemental and amended complaint pursuant to Federal Rules of Procedure 15(a) and (d). (Id.) However, in its reply, Plaintiff concedes that it is only appropriate to seek leave to file an amended complaint. (ECF No. 42 ("Reply") at p. 2, lines 10-12.)
Plaintiff seeks to file an amended complaint to set forth new allegations concerning facts it claims it was unaware of "prior to filing the Complaint, and only recently discovered ... through discovery and investigation," as well as a claim for increased damages. (ECF No. 34-1 ("Motion") at pp. 1-3.) Specifically, Plaintiff seeks to add facts relating to Defendant's "SEGUE BY BENCHMARK" program ("Segue Program"). (Id.)
Defendant opposes Plaintiff's Motion. (ECF No. 41.) This matter was taken under submission on February 24, 2014. (ECF No. 43.) Thereafter, on April 28, 2014, Defendant filed a motion for summary judgment or, in the alternative, summary adjudication (ECF No. 48) and Plaintiff filed a motion for summary judgment (ECF No. 55). Briefing has not completed on the summary judgment motions. Oppositions are due no later than July 7, 2014. (ECF No. 60.) On May 22, 2014, this case and all pending motions were transferred to Judge Bashant. (ECF No. 59.)
II. LEGAL STANDARD
In support of its motion, Plaintiff cites Rule 15(a) of the Federal Rules of Civil Procedure, which provides that "a party may amend its pleading only with the opposing party's written consent or the court's leave" and leave shall be given freely when justice so requires. Fed. R. Civ. P. 15(a)(2).
In its motion, Plaintiff also moved to file a supplemental complaint citing to Rule 15(d) of the Federal Rules of Civil Procedure, which provides that "the court may, on just terms, permit a party to serve a supplemental pleading setting out any transaction, occurrence, or event that happened after the date of the pleading to be supplemented." Fed. R. Civ. P. 15(d); see also ECF No. 34 at p. 2. However, as noted above, Plaintiff conceded in its Reply that it is only appropriate to seek leave to file an amended complaint. (Reply at p. 2.) Therefore, the Court will not treat Plaintiff's motion as one for leave to file a supplemental complaint.
However, Rule 15 does not provide the initial standard under which the Court considers Plaintiff's request to amend its complaint. After a scheduling order has been issued setting a deadline to amend the pleadings, as is the case here, and a party moves to amend the pleadings after the deadline, the motion amounts to one to amend the scheduling order and thus is properly brought under Rule 16(b) rather than Rule 15. See Johnson v. Mammoth Recreations, Inc., 975 F.2d 604, 607-08 (9th Cir. 1992).
While a court may deny as untimely a motion for leave to amend after a scheduling order deadline has passed, simply because the plaintiff did not request a modification of the scheduling order as well, the Court here, in an exercise of its discretion, declines to do so. Johnson, 975 F.2d at 608. Rather, the Court exercises its discretion to construe the instant motion as one to amend the scheduling order and for leave to file an amended complaint.
Under Rule 16, a scheduling order "may be modified only for good cause and with the judge's consent." Fed. R. Civ. P. 16(b)(4). The decision to modify a scheduling order is within the broad discretion of the district court. Johnson, 975 F.2d at 607 (citation omitted). If good cause is shown, the court proceeds to consider the requirements of Rule 15(a). Id. at 608 (citing approvingly Forstmann v. Gulp, 114 F.R.D. 83, 85 (M.D.N.C.1987), for its explication of this order of operations); C.F. v. Capistrano Unified School Dist., 656 F.Supp.2d 1190, 1192 (C.D. Cal. 2009).
III. DISCUSSION
The Scheduling Order in this case set forth a pleading amendment deadline of June 29, 2013. (ECF No. 22 at ¶ 1.) The current motion was not filed until January 22, 2014. Thus, Plaintiff is required to demonstrate good cause under Rule 16 for filing an amended pleading nearly seven months past the deadline. See Coleman v. Quaker Oats Co., 232 F.3d 1271, 1294 (9th Cir. 2010).
A. Rule 16 Analysis
Under Rule 16(b)(4)'s good cause standard, the court's primary focus is on the movant's diligence in seeking the amendment. Johnson, 975 F.2d at 609. "Good cause" exists if a party can demonstrate that the scheduling order could not or "cannot reasonably be met despite the diligence of the party seeking the extension." Id. (citations omitted). "[C]arelessness is not compatible with a finding of diligence and offers no reason for a grant of relief." Id. "Although the existence or degree of prejudice to the party opposing the modification might supply additional reasons to deny a motion, the focus of the [Rule 16] inquiry is upon the moving party's reasons for seeking modification." Id. (citations omitted). The party seeking to continue or extend the deadlines bears the burden of proving good cause. See Zivkovic v. S. Cal. Edison Co., 302 F.3d 1080, 1087 (9th Cir.2002); Johnson, 975 F.2d at 608-09.
In addressing the diligence requirement, one district court in this Circuit noted:
[T]o demonstrate diligence under Rule 16's "good cause" standard, the movant may be required to show the following: (1) that [it] was diligent in assisting the Court in creating a workable Rule 16 order.. ; (2) that [its] noncompliance with a Rule 16 deadline occurred or will occur, notwithstanding [its] diligent efforts to comply, because of the development of matters which could not have been reasonably foreseen or anticipated at the time of the Rule 16 scheduling conference...; and (3) that [it] was diligent in seeking amendment of the Rule 16 order, once it became apparent that [it] could not comply with the order....Jackson v. Laureate, Inc., 186 F.R.D. 605, 608 (E.D.Cal.1999) (internal citations omitted). If the district court finds a lack of diligence, "the inquiry should end." Johnson, 975 F.2d at 609. If, however, the movant clears the Rule 16 bar, the Court proceeds to considering the motion under the usual standard of Rule 15. Campion v. Old Republic Home Protection Co., Inc., 861 F.Supp.2d 1139, 1150 (S.D. Cal. 2012).
Plaintiff asserts it was unaware of the Segue Program when it filed its Complaint on December 11, 2012. (Motion at p. 1.) Rather, Plaintiff claims it visited Defendant's website at the outset of litigation but did not see any reference to the Segue Program, and only learned of the Segue Program later, on or about November 19, 2013, during the deposition of Defendant's Director of Finance. (Motion at p. 2, ECF No. 34-3 ("Gubernick Decl.") at ¶¶ 4-6). In response, Defendant argues the Segue Program was established prior to the filing of Plaintiff's Complaint and "[d]etailed information regarding the [Segue Program] has been available on the Benchmark website since November 2011." (ECF No. 41-1 ("Opp.") at p. 4, lines 2-4.) In support of this argument, Defendant attaches screenshots of its website from showing that a link to the Segue Program appeared on its website as early as November 15, 2011. (ECF Nos. 41-2 ("Amstutz Decl.") at ¶ 6; 41-4 ("Ex. C") at p. 10.) Defendant also attaches screenshots of its website showing brief information about the Segue Program on its website from as early as January 18, 2012. (Amstutz Decl. at ¶ 6; Ex. C at pp. 37-38.)
Given the foregoing, the question is whether Plaintiff, acting diligently, could have reasonably met the June 29, 2013 deadline to amend the Complaint set forth in the Scheduling Order. Arguably, Plaintiff should have known the facts underpinning the new allegations it seeks to add prior to the filing of its initial Complaint. However, Plaintiff argues it did not see and/or understand the Segue Program until after the deposition on November 19, 2013, well past the amendment deadline set forth in the Scheduling Order. (Reply at pp. 3-4.) The Court finds this argument plausible. Particularly as it appears Plaintiff was diligent in assisting the Court in creating a workable Scheduling Order, including seeking to modify the Scheduling Order through a joint motion when the parties experienced delays in producing documents (ECF No. 27), complied with the Scheduling Order in all other respects, and was diligent in seeking to amend the Complaint shortly after it discovered the new facts at issue. Moreover, there is no suggestion Plaintiff knew of the allegations prior to filing the Complaint or made a tactical decision at the outset of the litigation not to include the allegations in its initial Complaint. Cf Trans Video Electronics, Ltd. V. Sony Electronics, Inc., 278 F.R.D. 505, 508 (N.D. Cal. 2011). Accordingly, the Court finds Plaintiff has sufficiently demonstrated "good cause" to amend the Scheduling Order. Because the Court finds that Plaintiff satisfies the requirements of Rule 16(b), the Court proceeds to consider the requirements of Rule 15(a).
Defendant argues that Plaintiff was on notice of the Segue Program well before November 19, 2013 through discovery. In support of this argument, Defendant attached copies of over one hundred pages of documents to their Opposition relating to the Segue Program which were produced by Defendant to Plaintiff on September 26, 2013. (Amstutz Decl. at ¶ 4, Exhibits A(1)-(5).) However, these documents, produced in September 2013, would not have aided Plaintiff in meeting the June 29, 2013 deadline in the Scheduling Order. Nothing suggests Plaintiff was actually aware of the Segue Program prior to June 29, 2013.
B. Rule 15 Analysis
"Rule 15(a) is very liberal and leave to amend 'shall be freely given when justice so requires.'" AmerisourceBergen Corp. v. Dialysist West, Inc., 465 F.3d 946, 951 (9th Cir. 2006) (quoting Fed. R. Civ. P. 15(a)); see also Kaplan v. Rose, 49 F.3d 1363, 1370 (9th Cir. 1994) (noting the "strong policy in favor of allowing amendment"). However, "a district court need not grant leave to amend where the amendment: (1) prejudices the opposing party; (2) is sought in bad faith; (3) produces an undue delay in litigation; or (4) is futile." AmerisourceBergen Corp., 465 F.3d at 951. These factors are not of equal weight as prejudice to the opposing party has long been held to be the most crucial factor in determining whether to grant leave to amend. Eminence Capital, LLC v. Aspeon, Inc., 316 F.3d 1048, 1052 (9th Cir. 2003); Jackson v. Bank of Hawaii, 902 F.2d 1385, 1387 (9th Cir. 1990); Howey v. United States, 481 F.2d 1187, 1190 (9th Cir. 1973). The Court considers each of these factors in turn.
1. Prejudice to the Opposing Party
The most critical factor in determining whether to grant leave to amend is prejudice to the opposing party. Eminence Capital, 316 F.3d at 1052 ("Prejudice is the touchstone of the inquiry under rule 15(a).") (internal quotes and citation omitted)). The burden of showing prejudice is on the party opposing an amendment to the complaint. DCD Programs, Ltd. v. Leighton, 833 F.2d 183, 187 (9th Cir. 1986). Prejudice must be substantial to justify denial of leave to amend. Morongo Band of Mission Indians v. Rose, 893 F.2d 1074, 1079 (9th Cir. 1990). Under Rule 15(a), [a]bsent prejudice, or a strong showing of any of the remaining [] factors," there is a presumption in favor of granting leave to amend. Eminence Capital, 316 F.3d at 1052.
Defendant argues it will suffer prejudice if Plaintiff is permitted to file an amended complaint and re-open discovery, because it would cost Defendant "considerable additional time and attorneys' fees." (Opp. at p. 5.) In its Opposition, Defendant focuses primarily on the prejudice that may be caused by re-opening discovery. (Id. at pp. 5-6.) Per the Amended Scheduling Order issued October 1, 2013, fact discovery in this matter closed on November 29, 2013 and expert discovery closed on March 28, 2014. (ECF No. 28.) This Motion was filed less than two months after fact discovery cut off on January 22, 2014.
Plaintiff argues "Defendant will not be prejudiced because the proposed amended pleading does not seek to radically change the course of this litigation; Plaintiff is not introducing new claims." (Reply at p. 6, lines 2-4.) Moreover, Plaintiff argues "[t]he amendments do not suddenly render prior discovery meaningless, nor would the amendments require significant and expansive discovery and escalated costs associated therewith." (Id. at lines 4-6.) Plaintiff offers that "only limited discovery" into the Segue Program would be necessary, and the taking of only one deposition of Defendant's person most knowledgeable concerning the Segue Program. (Id. at lines 6-9.)
The Court is not persuaded that Defendant will suffer prejudice should Plaintiff be permitted to file an amended complaint. The proposed amended complaint does not add a new party or new causes of action, or significantly change the course of the litigation. Therefore, any additional discovery would be very limited. Moreover, as demonstrated in its Opposition, Defendant has already produced well over one hundred documents related to the Segue Program, including multiple internal communications, drafts, and brochures regarding the program. (Opp. at pp. 2-3; Amstutz Decl. at ¶ 4, Exhibits A(1)-(5).) Thus, to the extent additional discovery is required to flesh out the new allegations, much of the work on the part of Defendant has already been done and the discovery costs incurred. Accordingly, this factor favors amendment.
The Court acknowledges that the parties have already filed motions for summary judgment in this matter, which is a consideration in this analysis. But Plaintiff filed its motion well before the summary judgment motion deadline of April 28, 2014 (see ECF No. 28 at ¶ 6). Thus, the Court cannot, in good faith, weigh this factor against Plaintiff.
2. Undue Delay
"Undue delay is a valid reason for denying leave to amend." Contact Lumber Co. v. P.T. Moges Shipping Co., 918 F.2d 1446, 1454 (9th Cir. 1990). Delay, by itself, however, does not always justify denying leave to amend. DCD Programs, Ltd., 833 F.2d at 186-87. "Relevant to evaluating the delay issue is whether the moving party knew or should have known the facts and theories raised by the amendment in the original pleading." Jackson, 902 F.2d at 1388. Considerable delay with no reasonable explanation is relevant where a proposed amendment would cause prejudice to the other party or would significantly delay resolution of the case. Id. However, delay caused by the parties waiting until they had sufficient evidence of conduct upon which they could base claims of wrongful conduct is a reasonable explanation. DCD Programs, Ltd., 833 F.2d at 187.
Plaintiff argues it "did not unduly delay in filing its Motion." (Reply at p. 5, line 15.) In support of this argument, Plaintiff asserts it only learned of and/or understood the Segue Program ten days before fact discovery cut off and only waited until January 22, 2014 to file its motion "because it was not fully aware of the extent of Defendant's use of SEGUE BY BENCHMARK." (Id. at p. 5, lines 15-17.) Thus, to the extent there was any delay, Plaintiff argues it was excusable. (Id. at p. 5, line 17.) Given the foregoing, the Court agrees there was no undue delay in filing this present motion.
3. Bad Faith
A bad faith motive is a proper ground for denying leave to amend. Sorosky v. Burroughs Corp., 826 F.2d 794, 805 (9th Cir. 1987). Defendant argues "Plaintiff's misrepresentations to the Court justify a finding of bad faith." (Opp. at p. 6, line 3.) However, as previously stated, the Court finds Plaintiff's argument that it did not see and/or understand the Segue Program until after the deposition on November 19, 2013, plausible. Moreover, in light of the technical issues Plaintiff experienced searching the discovery (Reply at pp. 2-4; Gubernick Decl.; ECF No. 42-3), the Court finds no evidence that Plaintiff acted in bad faith in making representations to the Court.
Defendant further argues that "the real motive behind the request for leave to amend is Plaintiff's desire to retake the depositions of Defendant's witnesses." (Opp. at p. 5.) However, Defendant does not provide anything to substantiate this argument. Therefore, this factor weights in favor of granting Plaintiff leave to file an amended complaint.
4. Futility of Amendment
"Futility of amendment can, by itself, justify the denial of a motion for leave to amend." Bonin v. Calderon, 59 F.3d 815, 845 (9th Cir. 1995). "[A] proposed amendment is futile only if no set of facts can be proved under the amendment to the pleadings that would constitute a valid and sufficient claim or defense." Sweaney v. Ada County, Idaho, 119 F.3d 1385, 1393 (9th Cir. 1997) (citation omitted).
Plaintiff's proposed amended complaint (ECF No. 34-2) alleges the same five causes of action as its initial complaint: (1) federal trademark infringement (15 U.S.C. § 1114(1)); (2) false designation of origin (15 U.S.C. § 1125(a)); (3) unlawful trade name use (Cal. Bus. & Prof. Code §§ 14200, et seq.); (4) California common law trademark infringement (Cal. Bus. & Prof. Code §§ 14200 et seq); and unfair competition and unfair business practices (Cal. Bus. & Prof. Code §§ 17200, et seq.) ("UCL"). To prevail on a trademark claim under the Lanham Act, a plaintiff must establish it has a protectable ownership interest in the mark and that the defendant's use of the mark is likely to cause consumer confusion. Rearden LLC v. Rearden Commerce, Inc., 683 F.3d 1190, 1202 (9th Cir. 2012) (citation omitted). Plaintiff's remaining claims are subject to the same legal standards. See id. at 1221; see also Murray v. Cable Natl. Broadcasting Co., 86 F.3d 858, 860 (9th Cir. 1996); Academy of Motion Picture Arts and Sciences v. Creative House Promotions, Inc., 944 F.2d 1446, 1457 (9th Cir. 1991); New West Corp. v. NYM Co. of California, Inc., 595 F.2d 1194, 1201 (9th Cir. 1979); E.& J. Gallo Winery v. Pasatiempos Gallo, S.A, 905 F.Supp. 1403, 1415 (E.D. Cal. 1994).
The "likelihood of confusion" inquiry "generally considers whether a reasonably prudent consumer in the marketplace is likely to be confused as to the origin or source of the goods or services bearing one of the marks or names at issue in the case." Rearden LLC, 683 F.3d at 1209. The Ninth Circuit employs eight factors (Sleekcraft factors) to determine whether there is a likelihood of confusion: (1) the strength of the mark; (2) proximity or relatedness of the goods; (3) similarity of the marks; (4) evidence of actual confusion; (5) marketing channels used; (6) type of goods and the degree of care likely to be exercised by the purchaser; (7) the defendant's intent in selecting the mark; and (8) likelihood of expansion of the product lines. Id. (citing AMF Inc. v. Sleekcraft Boats, 599 F.2d 341, 348-49 (9th Cir. 1979)).
As in the initial Complaint, Plaintiff alleges in the proposed amended complaint that it is the owner of a federally registered service mark in "RECOVERY BY BENCHMARK." (ECF 34-2 at ¶ 23.) Plaintiff's new allegations include that Defendant's advertising under the name "SEGUE BY BENCHMARK" which "mirrors" Plaintiff's "RECOVERY BY BENCHMARK" name and offers services that "mirror" Plaintiff's "RECOVERY BY BENCHMARK" services is likely to cause confusion and is a violation of each of the alleged causes of action. Plaintiff further alleges it has suffered damages as a result. The Court finds these allegations sufficient to state a claim, therefore amendment would not be futile. Notably, Defendant does not argue in its Opposition that the new allegations are insufficient or that amendment would be futile.
See ECF 34-2 at ¶¶ 46-52, 58-60, 62, 64, 70-72, 75, 77, 83, 85-87, 90-91, 94-95, 98, 100, 106, Prayer for Relief ¶¶ 2-3, 7(a)-(c), 8.
--------
Weighing all of the factors, the Court finds that Plaintiff should be given leave to file an amended Complaint.
IV. CONCLUSION & ORDER
In light of the foregoing, the Court GRANTS IN PART and DENIES IN PART Plaintiff's motion for leave to file a supplemental and amended complaint. The Court DENIES Plaintiff leave to file a supplemental complaint in the form attached to its Motion. However, the Court GRANTS Plaintiff leave to file a first amended complaint adding allegations related to the Segue Program consistent with this Order. If Plaintiff chooses to file an amended complaint, it must do so no later than July 10, 2014. If the parties wish to re-open discovery on a limited basis consistent with this Order following the filing of a first amended complaint and to continue the motion deadline, they must seek leave to do so from Magistrate Judge Skomal.