From Casetext: Smarter Legal Research

Atlanta West Point R. Co. v. Creel

Court of Appeals of Georgia
May 8, 1948
77 Ga. App. 77 (Ga. Ct. App. 1948)

Summary

In Atlanta West Point R. Co. v. Creel, 77 Ga. App. 77 (47 S.E.2d 762), the defect was defective brakes, which an outside inspection would have revealed.

Summary of this case from Butler v. Central of Ga. Ry. Co.

Opinion

31976, 31977.

DECIDED MAY 8, 1948.

Damages; from Fulton Superior Court — Judge Almand. December 29, 1947.

Heyman, Howell Heyman for A. W. P. R. Co., Neely, Marshall Greene, for So. Ry. Co.

George John L. Westmoreland, for Creel.


1. The verdict is supported by the evidence, and the trial judge did not err in overruling the general grounds of the motions for a new trial.

( a) This court, on the general grounds of a motion, will not disturb the verdict of a jury which has the approval of the trial judge where there is any evidence to support the verdict.

2-6. Under the pleadings and the evidence in this case the charges of the court to the jury on which error is assigned in the special grounds of the motions for new trial are not error for any reasons assigned.

7. A ground of a motion for new trial is not in proper form for consideration, unless it is complete within itself, and it is not complete, if, to be intelligible, it is necessary to refer to other parts of the record, including the charge of the court.

8. The trial judge did not err in overruling the amended motions for a new trial.

DECIDED MAY 8, 1948.


J. E. Creel sued the Atlanta West Point Railroad Company and the Southern Railway Company in Fulton Superior Court for damages sustained as a result of personal injuries incurred on December 4, 1945, while engaged in moving a gondola car for the purpose of placing it under a crane operated by the LeRoy Smith Lumber Company, his employer, in order that the car might be unloaded.

In his petition, Creel alleged that the Southern Railway Company was negligent in the following particulars: In furnishing and putting in traffic Southern Car No. 195114 equipped with defective and unworkable brakes, and in failing to exercise ordinary care to see that the car and its brake equipment were in reasonably safe and workable condition. He alleged that the Atlanta West Point Railroad Company was negligent as follows: In failing to properly inspect Southern Car No. 195114 so as to ascertain the defective condition of the brakes, and in failing to make the necessary repairs to the brakes as to render them reasonably safe, and in failing to notify the consignee, the LeRoy Smith Lumber Company, of the defective condition of the brakes, and in placing the car, with defective brakes, on the spur track of the lumber company, when it knew that employees of the consignee would move the car to the crane for the purpose of unloading. Both defendants denied all allegations of negligence.

The evidence shows that: The gondola car at the time of the accident was located on a spur track on the premises of the plaintiff's employer, the LeRoy Smith Lumber Company, at Union City, in Fulton County, Georgia, and had been placed there with other cars by the Atlanta West Point Railroad Company. This spur track goes downgrade from the main line of the Atlanta West Point Railroad Company to that of the Atlantic Coat Line. It was customary for the Atlanta West Point Railroad Company to deliver cars to the plaintiff's employer by placing them on the spur track, and when they could not be placed sufficiently near the crane for unloading, they were placed on the spur at a point between the crane and the main line of the Atlanta West Point Railroad Company so that when ready for unloading the employees of the LeRoy Smith Lumber Company could release the brakes on the cars and allow them to roll down grade to a point under the crane. The car which the plaintiff was attempting to move at the time of the accident was car No. 195114, gondola type, owned by the Southern Railway Company. It had been delivered in Atlanta, fully loaded with heavy timber, by the Southern Railway Company to the Atlanta West Point Railroad Company, who in turn had carried the car to Union City and delivered it to the LeRoy Smith Lumber Company by placing it upon the spur track. At the time of the accident the plaintiff was superintendent of the LeRoy Smith Lumber Company. Securing Car No. 195114 so that it could be unloaded. Upon learning that the negro helper was not acquainted with the details of operating the brakes after setting a car in motion, the plaintiff secured a piece of lumber for use as a brake stick, and after releasing the air brakes of the car, mounted it on the down grade end where the hand brake mechanism was located. This mechanism consists of a vertical rod on one end (exterior) of the car, in this case the down grade end, with a wheel at the top end of the rod, and this rod passes through a little metal base at the top of the car downward through a wooden platform about 2 1/2 feet below the top edge of the car. At the lower end of the rod there is a chain attached, so that when the rod is turned by the wheel at the top, the chain is wrapped around the rod and shortens, causing the brake shoes on each wheel to press against the wheels, and this is what causes the braking of the car. On the rod, about halfway down, there is a cogwheel which engages a ratchet located on the wooden platform. Although some cars have an automatic ratchet, on this particular car it was necessary to "toe the latch" to make it engage the cogwheel and hold the brake rod, when setting the brakes to hold the car, and in order to get a new hold on the brake wheel when necessary. The car was set in motion down grade towards the crane and Creel started operating the brake mechanism, using the brake stick that he had secured, by placing it inside the wheel at the top of the rod, and against the rod. He could hold the brakes tighter by using a brake stick than by using the wheel alone. After the car had traveled about 50 feet Creel realized that the brakes were not holding the car, and he called to his helper to get a piece of lumber to chuck the car, but the negro stumbled and fell and could not come to his aid. The car gained momentum and Creel placed one leg inside the car so as to be able to pull harder on the brake mechanism, but this proved futile, and by this time the car was going so fast he was afraid to jump, and he realized he was not going to be able to stop the car, and fearing injury if the timber shifted, a collision with other cars at the lower end of the spur being inevitable, he pulled his leg from the inside of the car. At no time did he attempt to work the toe latch and as to why he did not use the latch, he testified "I had it just as tight as I could get it. I didn't need to take the brake stick out and get a new hold. I was putting all the pressure I had on it. I didn't use the ratchet." He said he knew how to use the ratchet, and always used the ratchet when he stopped a car where he wanted it to stand. At the lower end of the down grade, near the Atlantic Coast Line track, were some other cars, including some empty cars that other employees of the lumber company had let get away earlier on the day of the accident, and the runaway car which Creel was trying to brake ran into these cars. When the collision occurred Creel was on the brake platform at the end of Car No. 195114 and between the two colliding cars. He was holding onto the top rim of the end of the car, and, when the cars hit, the load of timber, which consisted of heavy timber as large as 12x12 and 40 feet long, shifted and pinned his left hand to the side of the car, causing the amputation of four fingers of that hand, and Creel was thrown against the other car by the impact, cutting and bruising severely his left thigh, and fracturing his left knee. Visual inspections of the brake mechanism of Southern Car No. 195114 had been made by the Southern Railway Company at the time the car was turned over to the Atlanta West Point Railroad Company in Atlanta, and further inspections had been made by that railroad in a similar manner before the car was delivered to the lumber company, and the brakes appeared to be in working order. After the accident, the car was unloaded, and was taken by the Atlanta West Point Railroad Company to the main line of that railroad and while empty a test of the hand brake mechanism was made by an experienced brakeman, who was able to lock the wheels of the car by using the hand brakes so that it skidded on the tracks while being pulled by an engine, and an examination of the car revealed no apparent defects in the braking mechanism.

The jury found for the plaintiff against both defendants for $6000, and judgment against the defendants was rendered accordingly. The case is here on exceptions to the overruling of motions for a new trial, each railroad having filed a separate motion. No. 31976 is brought to this court by the Atlanta West Point Railroad Company, naming the plaintiff and the Southern Railway Company as defendants in error, and No. 31977 is brought to this court by the Southern Railway Company, naming the plaintiff and the Atlanta West Point Railroad Company as defendants in error. In general, the assignments of error by each railroad company are the same, and the cases have been considered together by this court.


1. On the general grounds of both motions for a new trial, the only question raised is whether or not there was any evidence to support the allegations of negligence. It was proved that visual inspections of the car and its braking equipment had been made by the Southern Railway Company in Atlanta before delivery to the Atlanta West Point Railroad Company, and that the latter railroad then made inspections of the car and its braking equipment before delivery to the consignee, and it is uncontradicted that no apparent defects in the brake equipment were found up to the time of delivery of Southern Car No. 195114 to the LeRoy Smith Lumber Company. Shortly after the accident, further inspections were made by the Atlanta West Point Railroad Company and no apparent defects were found. Under such a state of facts and circumstances a jury would not be authorized to find that the brakes were defective to the extent that the mechanical condition of the brake was defective, nor that there was a failure to make proper inspections. However, Creel testified, and it was uncontradicted, "I was using a brake stick that day . . I had it just as tight as I could get it. I didn't need to take the brake stick out and get a new hold. I was putting all the pressure I had on it." As he was putting all the pressure he could on the brakes, he said he did not need to use the ratchet to get a new hold. The car was heavily loaded with lumber and was on a down grade. This is sufficient to raise the inference that, although the hand-brake mechanism was apparently in perfect working condition, it was insufficient to hold the heavily loaded car once it had been set in motion on a down grade. It was within the knowledge of both railroad companies that at some time the car would be unloaded, and it was the duty of both the owner of the car and the ultimate carrier to see that the car and its devices for unloading were reasonably safe for the purpose of unloading. See Roy v. Georgia R. Bkg. Co., 17 Ga. App. 34, 35 (2) ( 86 S.E. 328). It was necessary for employees of the consignee to use the hand brakes of the car in this case to move the car for the purpose of unloading, and consequently the hand-brake mechanism was one of the devices necessary for unloading. See Weeks v. Pollard, 65 Ga. App. 377, 388 ( 16 S.E.2d 225). The Atlanta West Point Railroad Company made a test of the hand brakes of the car, while it was empty and on the main line of the railroad, and found that the wheels of the car could be locked by using the brake mechanism, so that the car skidded on the track when pulled by an engine. Although this evidence may have been sufficient to have precluded the jury from finding, in the absence of direct evidence to the contrary, that there was any mechanical defect in the hand brakes at the time of the accident, still this test was not made under a sufficiently similar set of facts and circumstances as were in existence at the time of the accident to preclude the inference that the hand brakes were insufficient to hold the car when heavily loaded with lumber and while in motion down grade on a track. If the latter finding was made, it follows that the car was not equipped with devices reasonably safe for unloading, and the duty to furnish a car equipped with devices reasonably safe for unloading rests equally upon the owner of the car, who delivers such car to the ultimate carrier, and the ultimate carrier. See Roy v. Georgia R. Bkg. Co., supra. This court will not disturb the verdict of a jury which has the approval of the trial judge where there is any evidence to support the verdict. Seaboard Air-Line Ry. Co. v. Jackson, 38 Ga. App. 446 ( 144 S.E. 223); Liberty National Life Ins. Co. v. Parrimore, 70 Ga. App. 320, 324 ( 28 S.E.2d 190); Pope v. Beasley, 200 Ga. 656 ( 38 S.E.2d, 300). As the jury is the final arbiter of fact, in order to uphold the finding of a jury which has the approval of the trial judge, this court will take that view of the evidence most favorable to the upholding of the verdict. Georgia Ry. Power Co. v. Flury, 17 Ga. App. 216 ( 86 S.E. 403).

This case is distinguishable from Western Atlantic R. Co. v. Gentle, 58 Ga. App. 282 ( 198 S.E. 257), cited and relied upon by the railroad companies. In that case there was no evidence that the couplers of the car were defective or that the railroad company was negligent, and there was positive and uncontradicted evidence that the couplers were not defective, and this precluded any inference that the couplers were defective, and it was also shown that when not defective, the couplers would sometimes fail to couple at the first impact of the cars, and this was the only inference that arose in that case and was insufficient to show negligence on the part of the railroad company there involved. That case relied upon the rule laid down in Frazier v. Georgia R. Bkg. Co., 108 Ga. 807 ( 33 S.E. 996), also cited and relied upon by the railroad companies in the present case, and that rule is inapplicable to such a situation as the present case where there is evidence to support an inference that the hand-brake mechanism was insufficient to hold the car, and there is no direct evidence to disprove this inference.

The plaintiff's petition was not demurred to by either defendant, and the evidence was sufficient to authorize the jury to find in favor of the plaintiff against both of the defendants under the allegations of the petition. The trial judge did not err in overruling the general grounds of the motions for new trial, of the defendants.

2. In special ground 5 of the motion for new trial of the Atlanta West Point Railroad Company error is assigned on that portion of the charge as follows: `I charge you that a railroad company, which is a common carrier, either as the owner or as the ultimate carrier, transporting a car containing freight, owes a duty to the consignee or his servants, when either the consignee or his servant is engaged in the business of unloading the car after it has arrived at its destination, this duty being to see that the car and its devices for unloading are reasonably safe for such purposes. This is true although the journey of the car is ended and it has been switched upon a sidetrack belonging to the consignee." Special ground 1 of the second amended motion of the Southern Railway Company assigns error on the same charge. Special ground 1 of the first amended motion of the Southern Railway Company also assigns error on the same charge, and in addition assigns error on the following charge: "The duty of a carrier which owns and furnishes a car to be ultimately delivered by other connecting carriers to a consignee whose servants are to unload the car is to exercise ordinary care to see that the car and its appliances for unloading it are in a reasonably safe condition, so that such servants, while themselves exercising ordinary care, can proceed with the work of unloading the car with reasonable safety." These grounds are without merit. The charges are applicable to the pleadings and evidence in the present case and are correct statements of law. See Roy v. Georgia R. Bkg. Co. supra; Southern Ry. Co. v. Benton, 57 Ga. App. 520, 522 ( 196 S.E. 256); Weeks v. Pollard, supra.

3. Error is assigned in ground 6 of the motion for new trial of the Atlanta West Point Railroad Company on the court's charge: "It is the duty of the ultimate carrier to inspect such a car and ascertain whether it and its unloading devices are in a reasonably safe condition, and if, on examination, the car or any part of its unloading devices is found to be dangerously defective, it is its duty to make such necessary repairs, or to notify the consignee of such dangerous defect." This ground is without merit. The charge is a correct statement of the law applicable to the present case. See Roy v. Georgia R. Bkg. Co., supra. The trial judge did not err in overruling this ground of the motion for a new trial of the Atlanta West Point Railroad Company.

4. Error is assigned in ground 7 of the motion of the Atlanta West Point Railroad Company, and in ground 2 of the second amendment to the motion of the Southern Railway Company because of the following charge of the court: "If either railroad selects and furnishes a defective or unsafe car to the consignee to be unloaded, it will be liable for personal injuries resulting from such defect to an employee of the consignee rightfully about the car in connection with the unloading of the shipment, if such employee is injured while in the exercise of ordinary care and the proximate cause of the injury is due to the negligence of the defendants." There is no merit in the contention of the railroad companies that this charge places a burden upon them greater than imposed by the laws of Georgia. The charge was applicable to the facts and circumstances of the present case and is a correct statement of the law. Roy v. Georgia R. Bkg. Co., supra; Atlanta West Point R. Co. v. Smith, 38 Ga. App. 20, 24 ( 142 S.E. 308); Savannah, Florida Western Ry. Co. v. Booth, 98 Ga. 20 ( 25 S.E. 928). The trial judge did not err in overruling these grounds of the motions.

5. Error is assigned in ground 8 of the motion of the Atlanta West Point Railroad Company, and in ground 3 of the second amendment to the motion of the Southern Railway Company because the court charged the jury: "A railroad's duty to all persons required to go upon its cars in connection with its carrying business is to use reasonable care to inspect such cars and have them in such repair or condition that they may be used with reasonable safety, and if it delivers a car received from a connecting carrier, it is under an obligation to make the same inspection of that as it does of its own, that is, to use ordinary diligence to see that it is in a reasonably safe condition, and if it is not, to warn the consignee what means it should employ to this end, and when they should be employed depends upon the surrounding circumstances. If the car is suitable and reasonably safe when it leaves the possession and control of the railroad, either the owner or the ultimate carrier, it has exercised due care. Neither the owner of the car nor the ultimate carrier is an insurer of the safety of its car, and neither are liable for injuries resulting from defects which no reasonably careful inspection would have discovered or from defects [not] apparent to an ordinarily careful person. If either railroad selects and furnishes a defective or unsafe car to the consignee to be unloaded, it will be liable for personal injuries resulting from such defect to an employee of the consignee rightfully about the car in connection with the unloading of the shipment, if such employee is injured while in the exercise of ordinary care and the proximate cause of the injury is due to the negligence of the defendants." This charge embodies a correct statement of law applicable to the facts and circumstances of this case, and the trial judge did not err in overruling these grounds of the motions for a new trial. See Roy v. Georgia R. Bkg. Co., Southern Ry. Co. v. Benton, Weeks v. Pollard, and Savannah, Florida Western Ry. Co. v. Booth (supra), and citations thereunder.

6. Error is assigned in ground 9 of the motion of the Atlanta West Point Railroad Company because the court charged the jury: "If the car is suitable and reasonably safe when it leaves the possession and control of the railroad, either the owner or the ultimate carrier, it has exercised due care." Error is assigned on the same charge in ground 4 of the second amendment of the motion of the Southern Railway Company. Both railroad companies contend that the instruction carries the implication that the failure to furnish a car suitable and reasonably safe when it left the possession of the railroad would constitute negligence. The charge, as well as the implication which the railroads contend arises from the charge, both embody a correct statement of the law when considered with other portions of the charge, in which the court pointed out that if the car was not in reasonably safe condition, it was the duty of the carrier to notify the carrier to whom the car was delivered, and the consignee, if there were any defects in the car. These grounds of the motions are without merit, and the trial judge did not err in overruling them.

7. Ground 2 of the first amendment to the motion of the Southern Railway Company assigns error on the charge of the court to the jury. Neither the charge of the court nor any portion thereof is set out in this ground. A ground of a motion for a new trial is not in proper form for consideration, unless it is complete in itself, and it is not complete, if, to be intelligible, it is necessary to refer to other parts of the record, including the charge of the court. See Trammell v. Shirley, 38 Ga. App. 710, 715 (Rule 14) (145 S.E. 486), and citations.

8. There is evidence to support the verdict, no error of law appears, and the trial judge did not err in overruling the motions for new trial of the defendant railroad companies.

Judgment affirmed. Felton and Parker, JJ., concur.


Summaries of

Atlanta West Point R. Co. v. Creel

Court of Appeals of Georgia
May 8, 1948
77 Ga. App. 77 (Ga. Ct. App. 1948)

In Atlanta West Point R. Co. v. Creel, 77 Ga. App. 77 (47 S.E.2d 762), the defect was defective brakes, which an outside inspection would have revealed.

Summary of this case from Butler v. Central of Ga. Ry. Co.
Case details for

Atlanta West Point R. Co. v. Creel

Case Details

Full title:ATLANTA WEST POINT RAILROAD COMPANY v. CREEL et al. SOUTHERN RAILWAY…

Court:Court of Appeals of Georgia

Date published: May 8, 1948

Citations

77 Ga. App. 77 (Ga. Ct. App. 1948)
47 S.E.2d 762

Citing Cases

J. R. Mabbett c., Inc. v. Ripley

Clearly Mabbett owed a duty to Ripley, who was required by his job to use the walkway on top of trailer #208,…

CSX Corp. v. Oglesby

The purpose of this duty is to assure "that [the customer’s] servants, while themselves exercising ordinary…