In which:
P = annual payment to be made for headwater benefits received by a downstream project,
Cp = annual section 10(f) cost of the headwater project,
En = annual energy gains received at a downstream project, or group of projects if owned by one entity,
Ed = annual energy gains received at all downstream projects (except those specified in § 11.10(b) of this chapter), and
Ej = portion of the annual energy generated at the headwater project assigned to the joint-use power cost.
18 C.F.R. §11.11